1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 4.00 LPA
P
roducts Manufacturer : Control panel, apfc panel, amf panel, ring main unit, Compact ubstation
panel, substation panel, flame proof panel, vcb panel, synchronizing panel, v... Products Trader
Street lights, vcb switchgear, outdoor vcb switchgear, compact substation, substation, street
glow lights, high bay lights, flood lights, Garage flood...
roducts Manufacturer : Control panel, apfc panel, ...
1 Opening(s)
10.0 Year(s) To 13.0 Year(s)
20.00 LPA TO 22.00 LPA
Job description
We are seeking an experienced and proactive CAPEX Electrical Procurement Manager to oversee the sourcing and procurement of Substation electrical equipment, materials, and services for Small, Medium and large-scale industrial SOLAR and WIND projects. The ideal candidate will ensure that all electrical procurement activities are aligned with project specifications, budgets, and ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
4.20 LPA TO 7.20 LPA
Job Title: Electrical Manager (SMS) - Substation Maintenance Services
Reports to: Operations Director/Head of Maintenance
Location: [Insert Location]
Job Summary:
We are seeking an experienced Electrical Manager to lead our Substation Maintenance Services (SMS) team. The successful candidate will oversee electrical maintenance activities, ensure compliance with safety regulations, and optimize substation performance. The Electrical ...
1 Opening(s)
9.0 Year(s) To 15.0 Year(s)
0.00 LPA TO 8.00 LPA
Company Name :- Medhaj Techno Concept Pvt. Ltd.Company Website :- https://www.medhaj.com/
Job DescriptionPosition Title: Engineer Trainee- ElectricalIndicative Roles & Responsibilities on Regularization:1. Operations of Sub-Stations: Monitoring of system parameters, Substationoperation as per guidelines, Outage coordination, Coordination withRTAMC/RLDC, Maintaining operational formats as per norms, Issuance ofpermits for maintenance/testing/line maintenance.2. Maintenance of Sub ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
7.00 LPA TO 8.00 LPA
Prepare and Timely deliver construction layouts like Plant & Sectional Layouts, Cable Trench Layouts, DSLPLayouts, Earthing Layouts, Illumination Layouts, Control Room Layouts etc. for Solar and wind projects up to220kV. Prepare Substation Design Calculations like Earthing Calculations, DSLP Calculations, Illumination Calculations, CT-PT Sizing Calculations, Cable Sizing Calculations etc. Solar ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
Not Disclosed by Recruiter
Calculations of:
ü Direct Stroke Lightning Protection
ü Earthing Design
ü Bus bar Selection
ü Short Circuit Force
ü Sag Tension
ü Battery sizing
ü Capacitor bank sizing
ü Cable sizing
ü Illumination Design Calculation ( indoor & outdoor)
Preparation and Review of Drawings:
ü Single Line Diagrams
ü Protection & Metering
ü Layouts & Sections
ü Erection Key Diagram
ü Earthing Layout
ü Clearance Check ...
3 Opening(s)
12.0 Year(s) To 20.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
3 Opening(s)
12.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
1.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 5.00 LPA
The missions and responsibilities of the CAD Executive_Engineering are :
- Preparation of Preliminary and detailed solar PV layouts for ground Mounted Solar PV & other
various supported Electrical equipment’s.
- Preparation of Array layout, stringing layout, cable routing and trench layout, road layout.
- Preparation of Electrical Layout for ICR, MCR, substation, street ...