3 Opening(s)
7.0 Year(s) To 10.0 Year(s)
4.50 LPA TO 5.50 LPA
Plant Operations
Managing the entire plant & process related operations & maintenance activity with a view to
achieve bottom line profitability with organization policy Along with effectively safe plant as well
as personnel operation.
▪
▪
Maintaining Plant production Data, inventory management.
Maintaining documentation related to IMS, OMS, PSM and Operational Discipline.. ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 2.00 LPA
AMC Contractors for Machines & Utilities, Reconditioning & Automation of Machines Machines
with PLC, Drives, Servos, Shifting, Erection, Installation of Machines & Utilities, Pick & Place
Manufacturing, Electrical Consultants, MSEB Liasoning, HT Line Erection, LT Installation, Panel
Manufacturing & Installation Work, Machine Loading Services, Machine Unloading Services
, Electrical Turnkey Projects, Glass Plant Consultants, ...
1 Opening(s)
0 To 3.0 Year(s)
1.40 LPA TO 1.50 LPA
Job description
Supervising & monitoring the construction activities civil, electrical & installion of D.G.Set, A.C, as per drawing &bull Site Engineer, Drawing & Estimation, RRC Details. &bull Materials, reinforcement & foundation Checking &bull Logistic, Supervision of erection of tower according to drawing &bull Preparation of working schedules for network build out ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 12.00 LPA
Preventive Maintenance Planning Spare Parts management Erection commissioning of Plant Machinery Knowledge of OHS and EMSMaintenance cost.Knowledge of Pneumatic and Hydraulic system.Working Experience with rubber industries will preferable for extrusion ProcessUtility maintenance, like Pumps, Motors, compressors, chilling plant, transformers, AFD, PLC, Power line Maintenance, HT line L.T.Panel ACB,VCB etc
Key Skills:
Electrical ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
A structural fitter works with blueprints and raw materials to assemble and fit together structural metal components for projects like buildings, bridges, and heavy machinery. Key responsibilities include cutting and shaping metal, laying out and marking parts, tack-welding assemblies, and ensuring all parts fit together according to specifications before permanent assembly by ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
5.00 LPA TO 6.00 LPA
Apply only if you are an Immediate Joiner or have a Notice Period of 15 to 30 days
Skills : Must have experience of Erection & Commissioning of Field Instruments Like RTD, TC, On/Off Valves, Control Valves, pH Analysers, Flow measuring Instruments. Field Instruments Like LEL /Hydrogen/Oxygen Meters, Prepare Project BOM, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
JOB PURPOSE : To strengthen site engineering team, To support engineering project team within the group
KEY ACCOUNTABILITIES
Basic knowledge of chemical processes
Preparation of Process Flow diagrams with Material and Energy Balance
Preparation of Process Data sheets
Preparation of Piping & Instrumentation Diagram in consultation with piping & Instrumentation engineers
Checking of Basic & Detail Engineering ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
1. Required Skills:
• Responsible for piping activities & Erection activities as per P&ID, ISO & GA drawing• Responsible for the erection of equipment like Chiller, Boiler, Reactors, Cooling tower, ANFD,Centrifuge, ETP & RO unit.• Responsible for commissioning activities & pre start up activities: Pneumatic/ Hydro as per processrequirement.• Responsible for ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
0.00 LPA TO 4.80 LPA
Place of posting/Location: Sayakha GIDC, Bharuch.
Job Description:
Must have skill:
• Responsible for piping activities & Erection activities as per P&ID, ISO & GA drawing• Responsible for the erection of equipment like Chiller, Boiler, Reactors, Cooling tower, ANFD,Centrifuge, ETP & RO unit.• Responsible for commissioning activities & pre start up activities: Pneumatic/ ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
8.00 LPA TO 12.00 LPA
Design of Enabling structure for construction stage analysis
Preparation of erection schemes for precast segments / Girders
Design of launching gantries/ Bridge builders for the erection of precast segments/ Girders
Design of short line /long line casting beds for segmental box girders/ U girders
Design of moulds for I girders / box girders/ U ...