1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Knowledge Mechanical maintenance of VMC and HMC , grinding machines, CNC machines, Robotic Washing ,CNC Washing, Honning Machine, central coolant system.Knowledge of fixture (machine shop, Engine assly & testing/dressing) of engine shop
Knowledge of Replacement of spindle, ATC unit, Hydraulic and pneumatic circuit diagram reading and diagnosis. Spindle run out correction ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.00 LPA TO 3.00 LPA
Knowledge Mechanical maintenance of VMC and HMC , grinding machines, CNC machines, Robotic Washing ,CNC Washing, Honning Machine, central coolant system.Knowledge of fixture (machine shop, Engine assly & testing/dressing) of engine shop
Knowledge of Replacement of spindle, ATC unit, Hydraulic and pneumatic circuit diagram reading and diagnosis. Spindle run out correction ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.00 LPA
To design and develop new product like ELMCB product mechanical and electrical point of view.
To maintain record of all developmentactivities.
Attend weekly meeting with management regarding new development.
To work on Design Software Creo-6.0 and Auto Cad 2016.
To Design &DevelopPlug Gauge, Profile Gauge, Jig & Fixture, SPM & Die for development product ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 4.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapour Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 7.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapour Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapor Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility manager.
1. ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 4.00 LPA
Job Location- Urawade Road Mulshi Pune
JOB DESCRIPTION
Job Description :Job Description:Company Profile:Company was founded in 1983 and is India's largest and most
reputed manufacturer of Electrical Steel Laminations, Motor Cores, Sub-Assemblies,
Die-Cast Rotors, and Press Tools. We have already diversified into manufacturing of
Castings, Steel Fabricated Parts and machined components stator and rotor assemblies
with ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapor Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility manager.
1. ...
5 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.84 LPA
Gear Designing or relevant engineering field and having full knowledge of Design Software SolidWorks
Software Works :- AutoCAD , Solid works, Kisssoft, STERP
Make Gear design in Kisssoft software
Make all parts drawing and 3D model
Casting pattern of Gear Box
Job Profile.
Software Works :- AutoCAD , Solid works and Inventor
Make all parts drawing and 3D model
Casting pattern of Hydraulics Pump ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
job description *
* wiring harness or cable harness
* daily process inspections FP ,LP ,Hourly ( line verification sheet)
* line veryfication sheet standerd review
* rejection rework & maintain record
* ok not ok master sample avaibility , verification , date review
* 4 M change monitoring
* skill matrix verification operator level
* M/C fixture ...