1 Opening(s)
1.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 3.00 LPA
A 1st Class Boiler Operator is responsible for safely and efficiently operating, monitoring, and maintaining high-pressure boilers and related equipment. Key duties include monitoring and adjusting water, fuel, and chemical levels; observing gauges and meters; performing routine inspections and maintenance; troubleshooting issues; and maintaining detailed logs of all activities. They are also responsible for ensuring the equipment ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.30 LPA TO 4.00 LPA
A Coal Handling Plant (CHP) Operator in a power plant is responsible for the safe and efficient operation of the plant's coal handling and fuel systems. Key duties include monitoring and controlling equipment, performing routine maintenance, ensuring proper fuel storage and supply, and troubleshooting issues to maintain operational continuity.
Key responsibilities
Equipment operation:
Operate and ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Operation of CHP Equipment:
Operate and control combined cycle gas turbine (CCGT), steam turbines, boilers, heat recovery steam generators (HRSG), and associated auxiliary equipment to generate electricity and thermal energy in accordance with production demands and grid requirements.
Monitor and adjust operating parameters such as fuel flow, steam pressure, turbine speed, and ...
10 Opening(s)
8.0 Year(s) To 14.0 Year(s)
Not Disclosed by Recruiter
Design engineer
6-15 years
BE/ Btech mechanical
job location- Vadodara
The Mechanical engineers should have experience in basic and Detail design of Power Plant, Waste to Energy Plant or Water Treatment plant.
The engineer should have good knowledge of Main Steam Cycle of super critical plant, Combined cycle power plant, Feed water Pumps, Condenser, Gas ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Operation of CHP Equipment:
Operate and control combined cycle gas turbine (CCGT), steam turbines, boilers, heat recovery steam generators (HRSG), and associated auxiliary equipment to generate electricity and thermal energy in accordance with production demands and grid requirements.
Monitor and adjust operating parameters such as fuel flow, steam pressure, turbine speed, and ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
3.60 LPA TO 6.00 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation
powerplant
& utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...
4 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 2.50 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...