5 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Civil Eng - Boundry survey, Fencing work, Grading, Levelling, Piling & ICR, 33 kV TL foundation work (Good to have outside boundary experience & 120 kV + TL foundation work experience)
Principle Accountabilities:
• Engineering drawings to be provided and compliance to the same as per engineering process. Maintaining Proper Drawings, records ...
1 Opening(s)
0 To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Grade & location - Senior Design Engineer Testing, L1.2, TML, ERC Jamshedpur(Approval
mail from LOB Head attached)Domain - Vehic le EngineeringSub-Domain - Project ManagementJob
Description : 1. Project tracking & timeline monitoring tool management 2. Ov erall knowledge about
vehicle PAT attributes 3. Executing the drive appraisal with Sr teams as per gateway ...
2 Opening(s)
6.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 20.00 LPA
Civil Lead - Boundary survey, Fencing work, Grading, Levelling, Piling & ICR TL foundation work + Substation and Bay area foundation,
PRINCIPAL ACCOUNTABILITIES Accountabilities Major Activities
Drive the qualification of identified new business opportunities in the wind power projects and wind dominated wind hybrid projects with the objective of supporting the growth of Renewables ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 22.00 LPA
Civil Lead - Boundary survey, Fencing work, Grading, Levelling, Piling & ICR TL foundation work + Substation and Bay area foundation,
PRINCIPAL ACCOUNTABILITIES Accountabilities Major Activities
Drive the qualification of identified new business opportunities in the solar power projects and solar dominated wind -solar hybrid projects with the objective of supporting the ...
1 Opening(s)
1.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 5.00 LPA
The missions and responsibilities of the CAD Executive_Engineering are :
- Preparation of Preliminary and detailed solar PV layouts for ground Mounted Solar PV & other
various supported Electrical equipment’s.
- Preparation of Array layout, stringing layout, cable routing and trench layout, road layout.
- Preparation of Electrical Layout for ICR, MCR, substation, street ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
17.00 LPA TO 22.00 LPA
Role & responsibilities
CIVIL Procurement (CEMENT/ steel rods /ICR/MCR/ RODS/ PILING/GRADING ETC) & purchase of CIVIL BOP essentials for Wind Projects
Contracts negotiations and management (Negotiation for Cost, Delivery, Warranty, Terms & conditions.)
Vendor management
CAPEX and Raw Material procurement Management
Budgeting & MIS and Reporting
â–¶ Spearheading the procurement of civil foundation materialsâ–¶ Building & cementing relationships ...
2 Opening(s)
10.0 Year(s) To 20.0 Year(s)
14.00 LPA TO 24.00 LPA
Civil Lead - Boundary survey, Fencing work, Grading, Levelling, Piling & ICR, 33 kV TL foundation work + Substation and Bay area foundation, 120 kV + foundation experience
PRINCIPAL ACCOUNTABILITIES Accountabilities Major Activities
Drive the qualification of identified new business opportunities in the solar power projects and solar dominated wind -solar hybrid ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
20.00 LPA TO 20.00 LPA
Essential Duties:
1. Site visit• Site Measurement: Roof detail measurement, cable route marking, termination point marking• Propose all component location to client.2. People co-ordination• Updating daily work to reporting manager3. Detailed Engineering• Detailed site visit report preparation• Understanding the OTM, Scope Matrix and KOM documents for the project• Preparation of shadow ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 10.00 LPA
Unit Solar Power BusinessFunction Quality
The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...