17 Job openings found

1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 3.60 LPA
The Foreman / Senior Fitter leads mechanical maintenance, installation, and repair of critical power plant equipment to ensure maximum operational uptime and safety. Key Responsibilities Supervision & Leadership Assign daily tasks to fitters and technicians. Monitor work progress and quality on-site. Enforce strict compliance with plant safety protocols. Conduct toolbox talks before every shift. Train junior technicians ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
We are seeking a skilled piping design engineer with experience in pressure vessel fabrication, piping layout, and related mechanical systems for the oil & gas and chemical industries. The ideal candidate will be responsible for the design, layout, and integration of piping systems connected to pressure vessels and other static equipment in ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
6.00 LPA TO 9.00 LPA
Position:        AM/Sr. Engineer - Project & Maintenance Location:        Sarigam near by Vapi Experience:    5 - 7 Years Industries:     Chemical Responsibilities: Generation of PFDs, P&IDs, Plant Layouts, Piping GA & Isometric drawings, Fabrication drawings and Technical specification sheets. Drawing checking & approval as per requirements. Generation of Bill of ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Sr. No. Details 1 To Execute and monitor brown field projects, Capex jobs, modification job, process improvement jobs by understanding process. 2 Plant Layout set up by understanding operational requirement with project manager 3 Equipment’s detailing, Erection and commissioning of GLR, SSR, Tanks, Pumps, Heat Exchangers, Vessels, Columns, Blowers ANF, Dryer, etc along with schedule bar chart 4 Reading ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Sr. No. Details 1 To Execute and monitor brown field projects, Capex jobs, modification job, process improvement jobs by understanding process. 2 Plant Layout set up by understanding operational requirement with project manager 3 Equipment’s detailing, Erection and commissioning of GLR, SSR, Tanks, Pumps, Heat Exchangers, Vessels, Columns, Blowers ANF, Dryer, etc along with schedule bar chart 4 Reading ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 7.00 LPA
Location:- Bhosari   Responsible for development of a piping SP3D Model and piping design on a project. Responsible for generation of piping isometric drawings and piping design packages. Interface with other function groups to gather information and to produce complete functional and constructible design packages. Under the direction of the Piping Engineer, the Designer is ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Sr. No. Details 1 To Execute and monitor brown field projects, Capex jobs, modification job, process improvement jobs by understanding process. 2 Plant Layout set up by understanding operational requirement with project manager 3 Equipment’s detailing, Erection and commissioning of GLR, SSR, Tanks, Pumps, Heat Exchangers, Vessels, Columns, Blowers ANF, Dryer, etc along with schedule bar chart 4 Reading ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile