1178 Job openings found

1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
0.00 LPA TO 0.00 LPA
We are having an urgent opening for the position of Product Manager for a reputed company.  Responsibilities:  As the Product Manager, you will be responsible for managing the roadmap, backlog, and delivery for our existing Mobile Apps (Android, iPhone), Desktop and Mobile websites, and an internal CRM tool. You’ll also be supporting multiple white ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 28.00 LPA
Job Description: As a senior software engineer, this position  will focus on the development and implementation the HighJump Warehouse Advantage Software Suite. The job responsibilities include technically configuring and integrating HighJump’s Warehouse Advantage using SQL Server, Advantage Architect, Advantage Link and Page Editor tools.   Responsibilities: Active participation in  functional and ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.44 LPA TO 2.40 LPA
Prepare samples for testing using various laboratory equipment. Maintain all laboratory records. Comply with the correct procedures, policies, and health and safety regulations. Conduct laboratory tests, analyze results, and document your findings. Stay informed with the latest industry trends, techniques, and best practices. Document all activities, results and report back to management. Clean and sterilize equipment ...
4 Opening(s)
3.5 Year(s) To 5.5 Year(s)
7.00 LPA TO 11.00 LPA
Project Role : Application Developer  Project Role Description : Design, build and configure applications to meet business process and application requirements.                                                            ...
1 Opening(s)
0 To 1.0 Year(s)
1.10 LPA TO 1.30 LPA
  Job description Roles and Responsibilities   Stack and pile finished goods into containers. Prepare goods for shipment. Pack them following a specific set of instructions. Check to ensure containers are damage free. Maintain database of packages. Fill out forms and papers to record measurement, weight, and product count. Arrange completed packages for Shipment. Load or stuff different products or merchandise. Count ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic / Electrical / Mechanical   Gender: Male   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as an associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase, Store & account dept. for new material requirement •To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Shendra MIDC, Aurangabad   for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic   Gender: Female   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase , Store & account dept. for new material requirement •To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Chitegaon MIDC , Aurangabad   for more details call on 7249840222
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.50 LPA
Any Graduate with 2-5 yrs of Experience in handling store activites for honda spare part.- Managing whole Spare parts unit in a service station. Maintain proper inventory.- Stock parts in systematic way and label bins/racks. - Tally the part number with physical material and requisition.- Handling inventory and dispatch.- Good ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
24.00 LPA TO 36.00 LPA
  gm hr  looking all hr activity on plant and corporate  exp on similer industries 25 to 35 tear E  Hide    Functional Area *   Select Functional Area Accounts / Finance / Tax / CS / Audit Consulting / Agent / Freelancer Architecture / Interior Design BFSI, Investments & Trading Journalism, Content writing & Editorial Top Management, Corporate Planning / Consulting Engg Design / R&D / ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.80 LPA TO 7.20 LPA
Job Summary 1 A Plant Manager is responsible for directing, coordinating, and managing the overall plant operation. Assures that the plant's production objectives are achieved at the lowest cost consistent with quality requirements while maintaining compliance with Federal, State, and Local Safety and Environmental regulations and laws. Delegates responsibility and works through the ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile