1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
A Helper Mechanical for a Coal Washery assists skilled mechanics in the maintenance, repair, and installation of the plant's mechanical systems and machinery. This entry-level role is crucial for ensuring the smooth and safe operation of the coal washing process.
Key Responsibilities
Assist Mechanics: Work alongside experienced mechanics to repair and maintain a variety of ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 1.92 LPA
A Fitter for a coal washery is primarily responsible for the maintenance, repair, and overhaul of mechanical equipment used in the coal preparation process, such as crushers, conveyors, pumps, and screens. The role requires a strong mechanical aptitude and a commitment to safety protocols in an industrial environment.
Key Responsibilities
Maintenance and Repair: Perform routine, ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
3.00 LPA TO 4.00 LPA
Roles & Responsibilities
Plans machining by studying work orders, blueprints, engineering plans, materials, specifications, orthographic drawings, reference planes, locations of surfaces, and machining parameters; interpreting geometric dimensions and tolerances (GD&T).
Plans stock inventory by checking stock to determine amount available; anticipating needed stock; placing and expediting orders for stock; verifying receipt of ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
12.02.26
126291
HPS/2026/131
Electrical /Mechanical Maintenance
Male
1
2 to 3
DME/DEE
10 Hrs
Key Responsibilities:
Routine Inspections and Preventive Maintenance:
Regularly inspecting and maintaining electrical and mechanical systems and equipment, including extruders, mixers, and other machinery used in masterbatch production.
Troubleshooting and Repair:
Diagnosing and repairing electrical and mechanical issues, including identifying faulty components and performing necessary repairs or replacements.
Equipment Operation and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 14.00 LPA
The Production Manager is responsible for leading the daily operations of the corrugation and conversion plant. This role ensures maximum productivity (OEE), minimal waste, high-quality production of 5-ply/7-ply sheets, and adherence to safety standards.
Key Responsibilities
Production Planning & Execution: Develop, implement, and monitor daily/weekly production schedules based on sales orders for ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
In the corrugation industry, a Quality Assistant Manager or Deputy Manager ensures that corrugated boxes and packaging materials meet stringent durability and safety standards. While a Deputy Manager typically holds a higher rank and acts as a direct backup to the Manager, an Assistant Manager focuses on executing daily operational quality tasks.
Key Responsibilities:
Quality Control (QC) Oversight: Conduct ...
3 Opening(s)
0.6 Year(s) To 3.0 Year(s)
2.00 LPA TO 4.00 LPA
Responsible for smooth running of Effluent treatment plant (ETP), Reverse Osmosis (RO), Multiple effect Evaporators (MEE), Agitated Thin Film Dryers (ATFD) and hazardous waste disposal.
Ensure Operational cost reduction by optimizing power, manpower, utilities and chemical consumption.
Treatment techniques in vision of quality/quantity (High TDS/ COD, Process effluents etc.)
Conduct environmental programs like ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 13.00 LPA
JOB DESCRIPTION
10.02.26
126029
HPS/2026/118
General Manager Operatios
Male
1
12 to 15
B.E-Mech
8 Hours
Industry: Wire Manufacturing | Steel | Heavy Engineering
Location: Sarigam, Gujarat (GIDC)
Reporting to: Deputy CEO and Managing Director
Travel: As required to Head Office, Mumbai
Years of Experience: 12+ years
Minimum Commitment: 2 years
Preferred Age: 35+ years
Role Overview The General Manager – ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 22.00 LPA
A Head Sinter Plant Project Job Description involves leading operations, maintenance, quality, and safety for the sinter plant, focusing on producing high-quality sinter for blast furnaces through process optimization, team management (engineers, operators), budget control, and adherence to safety/environmental standards, requiring extensive experience in heavy industry processes like sintering, blast furnace ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
20.00 LPA TO 25.00 LPA
A General Manager (GM) of Projects and Operations for a Sinter Plant leads end-to-end plant execution, daily production, and maintenance. They oversee raw material processing, quality control, equipment reliability, and safety compliance to ensure optimal sinter cake production for blast furnaces. [1, 2, 3]
Core Responsibilities
1. Project Management & Strategic Planning
Project ...