1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
6.00 LPA TO 6.50 LPA
Position: Shift Incharge - Production
Location: Ankleshwar
Experience: 3 - 4 Years
Industries: Chemical
Responsibilities.
Ensure the Plant Operation with Full Safety.
Ensure the Production, Yield Targets are achieved with specified Quality Parameters.
Ensure the Employees skill upgradation time to time for various job rotation.
Ensure the plant follows ...
4 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.00 LPA
Position: Production Chemist
Location: Dahej
Experience: 2 - 3 Years
Industry: Chemical
Responsibilities
To handle shift production in plant
To handle the troubleshooting in shift operations
Maintain batch production records, log book and register for proper documentation
Responsible for adherence to SOPs for all plant ...
2 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 20.00 LPA
Position: Deputy Manager/Manager - Procurement
Location: Assam (Site Location)
Education: BE/B.Tech in Civil / Mechanical
Experience: 8 to 15 years of experience in Procurement and Supply Chain Management of Civil, Mechanical & MEP packages/items having exposure in EPC or EPCM projects such as Oil & Gas, Petrochemical, Refinery, Power, Solar, Construction and other industrial ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
A Shift Incharge in a Steel Melting Shop (SMS) oversees production, safety, and operations during a specific shift. Their core duties involve monitoring equipment (like Electric Arc Furnaces and Continuous Casting Machines), managing shift personnel, resolving breakdowns, and enforcing quality standards to ensure continuous, efficient steel production. [1, 2, 3]
Key ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
The Assistant Manager of Process (SID) oversees daily sponge iron production. They optimize kiln parameters, manage raw materials, reduce waste, and ensure safety standards to meet quality and cost targets. [1]
Key Responsibilities
Production & Process Control
Monitor Kiln Operations: Direct daily operation of DRI kilns, coolers, and coal injection systems.
Optimize Parameters: Adjust ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
6.00 LPA TO 7.00 LPA
Position: Store Officer
Location: Lote - Ratnagiri
Experience: 5 - 8 Years
Industries: Chemical - MNC
Responsibilities:
To coordinate with other departments (both at the plant & HO) with materials related issues
To receive material (raw Packing & finished & Engg) in accordance with orders from suppliers
Verify documents such as vehicle ...
24 Opening(s)
6.0 Year(s) To 7.0 Year(s)
7.00 LPA TO 8.00 LPA
Position: Field Operator
Location: Lote - Ratnagiri
Experience: 6 - 7 Years
Industries: Chemical MNC
Responsibilities:
Coordinate with stores for RM / PM issues
Vessel cleaning check prior to batch charging.
Start Batch preparation and charging of RM.
Vigilant process monitoring and provide regular field report to shift manager regarding process and abnormalities ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Position: Electrician
Location: Lote - Ratnagiri
Experience: 2 - 5 Years
Industries: Chemical
Responsibilities:
Perform preventive maintenance work as per maintenance schedule on a daily basis
Provide necessary support to the processes of the Production and Projects departments on daily basis
Ensure the smooth functioning of all electrical units and equipment at ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.20 LPA
A Rice Mill Manager oversees all day-to-day operations of a paddy processing facility. They direct production, quality control, inventory, and staff to ensure plants operate safely and efficiently while meeting processing targets and industry standards. [1, 2, 3]
Here is a comprehensive breakdown of the role:
Core Responsibilities
Production Planning: Translate raw paddy ...
1 Opening(s)
8.0 Year(s) To 13.0 Year(s)
Not Disclosed by Recruiter
Construction Quality Manager
Job Location:- Vadodara, Gujarat
1. About the Role
Ensure effective execution of field service quality activities by driving inspections, testing, audits, and documentation, enabling compliant and right-first-time construction and commissioning outcomes, in line with project and organisational quality standards.
2. Organisational Placement
Reports to: Project Quality Head
3. Key Responsibilities
Deploy and maintain ...