1 Opening(s)
18.0 Year(s) To 20.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at Chhattisgarh Location.
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.00 LPA
Responsible to check all the steps from beginning to end.
Responsible to report preparation of raw material like coal rake & iron ore rake.
Responsible for equipment health & maintenance.
preparing daily testing & MIS reports
Ensure proper house keeping of lab area.
collection of sample checking the quality & reporting the seniors
responsible implementing 5s ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.80 LPA TO 6.00 LPA
WE Are Currently Looking For Fitter For BENEFICIATION Division at Nigeria (West Africa) Location.
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates and ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.80 LPA TO 6.00 LPA
WE Are Currently Looking For Fitter For Pellet Division at Nigeria (West Africa) Location.
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
50.00 LPA TO 80.00 LPA
Urgent Requirement for AGM/DGM-BENEFICIATION for 350*4tpd plant at Nigeria (West Africa) location
Projects sponge Iron to completion and running of plant. Both Kilns and auxiliaries project planning, control and execution.
Supervising project activities and handling the complete project cycle entailing requirement gathering and final execution.
Finalizing the requirements and specification in consultation with ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
50.00 LPA TO 80.00 LPA
Urgent Requirement for AGM/DGM/MECHANICAL MAINTENANCE/PELLET for 350*4tpd plant at Nigeria (West Africa) location
Projects sponge Iron to completion and running of plant. Both Kilns and auxiliaries project planning, control and execution.
Supervising project activities and handling the complete project cycle entailing requirement gathering and final execution.
Finalizing the requirements and specification in consultation ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 12.00 LPA
Having knowledge of compounding of rubber to metal bond product, Extrusion, Microwave curing,moulding, Fire, flame & smoke retardant, sponge product.
Having knowledge about Compound preparation and related machinery (Intermix, Dispersion Kneader &Mixing Mill).
Having knowledge of Rubber product manufacturing process: Compression, Transfer & Injection molding,extrusionas well as CV line profile.
Troubleshooting during rubber ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.60 LPA
A Chemist (SID/Raw Material) in the steel/mineral industry conducts chemical analyses of raw materials (iron ore, coal, coke, limestone) and finished products (sponge iron, pig iron, slag) to ensure quality standards. They perform wet chemical analysis, operate instruments like proximate analyzers, and maintain lab safety in a plant setting.
Key Responsibilities
Chemical Analysis: Perform ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
Urgent Requirement for Assistant Manager Electrical SID for Reputed Steel plant at Bilaspur location.
In rotary kiln: - Maintenance of motor used for kiln main drive, auxiliary drive, shell air fans, coal injector, and thermocouple and transmitters.
Cooler section: - Maintenance of motor used for cooler drove.
Product separation building: - Maintenance of ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 25.00 LPA
commissioning of following Projects
Working as Project Lead steel melting shop,blast furnace,rolling mill,power plant,sponge iron,ferro alloys,
Monitoring/ tracking projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of the sameManaging overall operations for executing projects involving scoping, high level design & architecture, resource mobilization and execution within ...