7 Job openings found

3 Opening(s)
12.0 Year(s) To 20.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection Job description This position exists to lead, manage, and support development of wind  business in accordance ...
3 Opening(s)
12.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection Job description This position exists to lead, manage, and support development of solar business in ...
2 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Electrical Eng - Substation knowledge, 33 kV, BOP Installation, Transformer testing, SCADA is Preferred, Good coordination with contractors (Outside boundary experience is good to have like 120/ 220/ 400 kV TL, Stringing) Project Execution experience for wind power plant  Checking inverters and Strings for faults and related. Rectifications, checking and rectification of defective strings ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
40.00 LPA TO 50.00 LPA
  Position – Head of Operations – Transmission Line/Distribution Line  – 1No. Job Role : Marketing and Project Execution  – Transmission Line   Qualification: B.E/ B.Tech in Electrical  & M.E/M.Tech added advantage. Preferable Exp. : 20-25 Years Experience in Proj. Management & marketing of Turnkey Proj.   Location: Head Office , South Delhi    Key Responsibilities:-   Experience ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.50 LPA
Roles & Responsibilities : Set up the SOP for site survey and design. Supervise the work of the design engineer for accuracy, and optimization of design as per site survey conducted. Ensure BoM is designed to maximize cost-benefit to achieve while keeping losses at a minimum. Conduct site surveys before plant design and ...
3 Opening(s)
8.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 14.00 LPA
Electrical Eng - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing (Good to have outside boundary experience & 120 kV + TL experience) Job description Supervising and verifying preventive maintenance as per schedule for solar power plant equipment's e.g. Modules, Inverters. Checking inverters and Strings for ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 4.80 LPA
Proven experience in the same or related role is required. Should be ready for field visits. Knowledge of AutoCAD Software and Google Sketch up is a must. Knowledge of PVSyst Software is an added advantage. Conduct site surveys before plant design and layout are finalized. DC & AC side designing which includes design & selection, ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile