2 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Electrical Eng - Substation knowledge, 33 kV, BOP Installation, Transformer testing, SCADA is Preferred, Good coordination with contractors (Outside boundary experience is good to have like 120/ 220/ 400 kV TL, Stringing)
Project Execution experience for wind power plant
Checking inverters and Strings for faults and related. Rectifications, checking and rectification of defective strings ...
1 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
A Mechanical Engineer for Wind Energy projects manages the installation, execution, and maintenance of wind turbines, focusing on component assembly (hub, nacelle, blades), torqueing, alignment, and troubleshooting, requiring a B.E./B.Tech in Mechanical Engineering, strong safety focus, and OEM experience, ensuring optimal turbine performance and project success in the renewable energy sector.
Key ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Designation : Manager Design / Assistant Manager DesignLocation : Head Office, AhmedabadExperience : 3-5 yearEducational Requirement : Electrical EngineerJob Title: Technical Engineer - OPGW/Conventional ConductorsJob Summary:We are seeking an experienced Technical Engineer to join our team, focusing on designing, analyzing,and developing technical specifications for Optical Ground Wire (OPGW), High-Temperature Low-Sag(HTLS), ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
12.00 LPA TO 15.00 LPA
Assistant Manager– Electrical DC -Projects/Construction
Position Overview:
We are seeking a highly skilled Electrical DC- Assistant Manager– Projects/Construction to manage the execution of DC-side electrical infrastructure for large-scale Solar PV projects. This role is mission-critical to ensure precise installation, defect-free commissioning, and long-term performance of solar assets. The DC Assistant Manager ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 4.80 LPA
Proven experience in the same or related role is required.
Should be ready for field visits.
Knowledge of AutoCAD Software and Google Sketch up is a must.
Knowledge of PVSyst Software is an added advantage.
Conduct site surveys before plant design and layout are finalized.
DC & AC side designing which includes design & selection, ...