3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipments Operation & Maintenence & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenence of electrical equipments like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
We are looking for Electrical electrical engineer for Power Plant at Raipur location.
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipment's / sub system of power ...
4 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 3.00 LPA
A "WTP Chemist Cum Operator TPP" job description (JD) would detail the responsibilities of a chemist and operator within a Thermal Power Plant (TPP) that also includes a Water Treatment Plant (WTP). This role would involve both chemical analysis of water samples and operating the WTP equipment to ensure efficient and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
Qualification: Degree Or Diploma in Mechanical EngineeringExperience: 2 to 5 years, Preference Material Handling Area of Thermal Power PlantAge: 28 to 35Gender: MalePlace of Posting: Mahan Energen, Waidhan, Singrauli, MP
Key requirements:Oversee and coordinate the erection and installation of steel structures, mechanical components at construction sites, ensuring compliance with project specifications, ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.96 LPA
Description:
Perform a full lifecycle product development (design, develop, test prototypes, manufacture and implement)
Design systems and components that meet needs and requirements
Produce outline designs
Conduct experiments methodically, analyse data and interpret results
Test and evaluate theoretical designs
Identify, formulate and produce effective solutions to emerging problems
Evaluate final product’s overall performance, reliability and safety
Alter and ...
3 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
LinkedIn page-: https://www.linkedin.com/company/ducon-infratechnologies-ltd
Position- Electrical Design Engineer
Experience-: 5 to 10 Yrs.
Location -: Thane, Mumbai.
Interview Mode-: Face to Face.
Alternate Saturday off.
Basic and detailed engineering experience of Thermal Power Plant, FGD, and Material Handling for EPC companies.
Preparation of electrical Load list, Load Analysis, Cable Routing plan, Panel Specifications, Cable Schedule, Cable Tray Layouts, Earthing ...