3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipments Operation & Maintenence & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenence of electrical equipments like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
4 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 3.00 LPA
A "WTP Chemist Cum Operator TPP" job description (JD) would detail the responsibilities of a chemist and operator within a Thermal Power Plant (TPP) that also includes a Water Treatment Plant (WTP). This role would involve both chemical analysis of water samples and operating the WTP equipment to ensure efficient and ...
3 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.44 LPA TO 2.16 LPA
A Coal Handling Plant (CHP) Helper in a steel manufacturing company/power plant supports the operation and maintenance of coal handling systems, ensuring a steady supply of fuel for boilers and furnaces. This role involves physical labor, material handling, and cleaning to maintain operational continuity.
Key Responsibilities
Fuel Handling and Feeding: Assist in receiving ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
Qualification: Degree Or Diploma in Mechanical EngineeringExperience: 2 to 5 years, Preference Material Handling Area of Thermal Power PlantAge: 28 to 35Gender: MalePlace of Posting: Mahan Energen, Waidhan, Singrauli, MP
Key requirements:Oversee and coordinate the erection and installation of steel structures, mechanical components at construction sites, ensuring compliance with project specifications, ...
3 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
LinkedIn page-: https://www.linkedin.com/company/ducon-infratechnologies-ltd
Position- Electrical Design Engineer
Experience-: 5 to 10 Yrs.
Location -: Thane, Mumbai.
Interview Mode-: Face to Face.
Alternate Saturday off.
Basic and detailed engineering experience of Thermal Power Plant, FGD, and Material Handling for EPC companies.
Preparation of electrical Load list, Load Analysis, Cable Routing plan, Panel Specifications, Cable Schedule, Cable Tray Layouts, Earthing ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
3.00 LPA TO 4.00 LPA
Key requirements:
Preference Material Handling Area of Thermal Power Plant.Place of Posting :Mahan Energen, Waidhan, Singrauli, MP
QA Engineer ensures that all the construction activities comply with quality standards, project specifications, and applicable regulations. They work closely with project managers, engineers, and contractors to maintain quality throughout the project life cycle.Key Responsibilities ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.50 LPA TO 4.50 LPA
Qualification: Degree Or Diploma in Mechanical Engineering with proficiency of safety. PG diploma in Industrial safety (ADIS / PDIS)Experience: min 2 to 5 years in handling industrial safety activities.Work location: Mahan Energen, Waidhan, Singrauli, MPAge 28 to 35Gender MalePreference Material Handling Area of Thermal Power Plant
Requirements for a Safety Engineer
Educational ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 8.00 LPA
LinkedIn page-: https://www.linkedin.com/company/ducon-infratechnologies-ltd
Position-: Piping Engineer - Design
Experience-: 5 to 8 Yrs.
Location-: Thane,Mumbai
Interview Mode-: Face to Face /Virtual
Alternate Saturday Off.
Job Purpose
·Preparation of data sheet, Piping Design calculation and, Plot plan and G.A. drawing review, pipe support analysis.
·Interface with other engineering discipline like project, civil, ...