1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
6.00 LPA TO 7.00 LPA
Job Responsibilities:
Production execution of all works.
Production Plan execution of all jobs at all works as per schedule received
Preplanning of Job Fabrication Against delivery Date of Equipments.
Ensure Proper Utilization of Manpower, Material & Machinery
Minimization of Raw Material Stock & Wastage reduction checking.
Manpower planning with Jr engineers and supervisors
Updating bar chart with ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 5.00 LPA
Production & Quality :
Receive Drawings from drawing department and issue the same to production supervisors.
Guiding production supervisors to proper job distribution as per delivery schedule.
Monitoring of Production status and leveling up the Priorities to meet the targets.
Prepare and Finalize the lay-up sequences of jobs.
Raw material inspections & verification of test ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
7.00 LPA TO 10.00 LPA
Key Activities / Tasks
Sr. No.
Activity / Task Description
1
Schedule and Execution of painting of all cranes with internal inspection
Reports and paint Test certificates prior to client Inspection. After
Satisfaction completion of paint Communicate with (AGM) Quality for final inspection. Final inspection witness with Client/ TPIA. Attend the punch points and get acceptance ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
6.00 LPA TO 7.00 LPA
Job Responsibilities:
Production execution of all works.
Production Plan execution of all jobs at all works as per schedule received
Preplanning of Job Fabrication Against delivery Date of Equipments.
Ensure Proper Utilization of Manpower, Material & Machinery
Minimization of Raw Material Stock & Wastage reduction checking.
Manpower planning with Jr engineers and supervisors
Updating bar chart with ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
8.00 LPA TO 10.00 LPA
Designation Assistant Manager/ Deputy Manager/ ManagerDepartment Quality Control – Paint BlastEmployee Name (if applicable) Not applicableReporting To AGM QA-QCNumber of Reportees (if any) NA
A. Key Activities / Tasks
1 Schedule and Execution of painting of all cranes with internal inspectionReports and paint Test certificates prior to client Inspection. AfterSatisfaction completion of ...
2 Opening(s)
14.0 Year(s) To 18.0 Year(s)
12.00 LPA TO 20.00 LPA
Create, implement, and maintain quality control procedures and standards, including documentation
Exposure to latest construction practices
Preparation of checklists, formats related to quality and safety
Random review of checklist, formats and test reports
Ensuring regular material testing in Independent third party Laboratory
Assisting and Guiding Project team for better quality of work and improving site ...
- Qa/qc Management
- Quality Assurance
- Quality Control
- Civil Construction
- Real Estate Projects
- High-rise Building Construction
- Site Quality Inspection
- Material Testing
- Quality Audits
- Is Codes & Standards
- Non-conformance Report (ncr)
- Snagging & Handover
- Concrete Quality Control
- Team Leadership
- Documentation & Compliance
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
5.00 LPA TO 6.00 LPA
The Quality Engineer is responsible for ensuring that all structural steel and PEB components comply with approved engineering drawings, client specifications, and industry standards.
This role requires preventing defects at every stage of the manufacturing cycle, from raw material intake to final dispatch clearance.
Key Responsibilities• Raw Material Inspection: Verify the quality, ...
1 Opening(s)
5.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 21.60 LPA
Job Title: Sr Production and Planning control engineer
Experience- Minimum 5 years
Location: Dubai
Salary- 7000 AED
Job Responsibilities-
To Understand cycle time of each product, do machine loading and scheduling orders based on priorities.
Working on Raw Material RM required for project and share same with Stores to check availability and indenting
Share RM Consumption plan based on ...
6 Opening(s)
5.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 14.00 LPA
Procedure Development & Approval: Develop, qualify, and approve Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR), and Welder Performance Qualifications (WPQ) as per ASME Sec IX, AWS D1.1, or API standards.
Quality Assurance & Inspection: Lead welding inspection activities, including visual inspection (VT) and interpreting NDT results (RT, UT, MT, PT) ...
15 Opening(s)
2.0 Year(s) To 4.0 Year(s)
0.00 LPA TO 0.00 LPA
Qualification: Diploma in Mechanical, Production, Automobile EngineeringExperience: min 2 to 4 yrs experience in operating of Grinding / Turning Machine from Bearing or Cutting tools manufacturing industries.Work location: Chakan in PuneDeployment through TPI on (Scheme NAPS , if candidates is already enrolling for PF and his PF is deducted then ...