2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
Not Disclosed by Recruiter
Calculations of:
ü Direct Stroke Lightning Protection
ü Earthing Design
ü Bus bar Selection
ü Short Circuit Force
ü Sag Tension
ü Battery sizing
ü Capacitor bank sizing
ü Cable sizing
ü Illumination Design Calculation ( indoor & outdoor)
Preparation and Review of Drawings:
ü Single Line Diagrams
ü Protection & Metering
ü Layouts & Sections
ü Erection Key Diagram
ü Earthing Layout
ü Clearance Check ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for Design Civil Lead for Renewables project (Solar & Wind) who has expertise in Design & Engineering of civil & structural works (experience of 10 – 14 yrs. in Solar/Wind/ ISTS projects)
Key Responsibilities
Accountability Supporting Actions Leadership Team
Management
Lead and mentor a team of civil engineers, providing guidance and fostering ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
10.00 LPA TO 15.00 LPA
We are looking for an Assistant Manager / Manager – Substation Design to lead design engineering activities for solar and wind projects up to 220kV. The role involves preparing layouts, calculations, and documentation, conducting electrical studies, and reviewing vendor designs in compliance with industry standards.
Location: Pune
Key Responsibilities
Prepare and deliver construction layouts (Plant, Sectional, ...
2 Opening(s)
8.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Position- Electrical DesignerExperience - 8+Qualification - Diploma - ElectricalIndustry - Oil& Gas /Power.Location - OmanInterview - VirtualSalary - 1000- 1100 OMR + Bachelor Accommodation
Job Description :8 to 10 Years of experience in Preparation of Detailed Electrical Engineering Drawings
Substations Single Line Diagrams, Equipment Layouts, Switchyard LayoutsCable Trench/ Routing Layouts, Cable Schedules, Bulk MTOs, Lighting and Earthing Layouts using ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
6.00 LPA TO 8.40 LPA
A Civil Design Engineer designs the civil and structural components of substations, including buildings, foundations, site grading, and underground utilities, ensuring compliance with industry standards and project specifications.
Design and Analysis:
Develop civil and structural design of RCC & Steel structures for substation buildings & equipments including precast and cast-in-situ components of ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.60 LPA TO 4.20 LPA
1. Preparing Pipeline routing, Pipeline and Instrumentation Drawings (P&ID),Layouts, General Arrangement drawings, Cross sections, wiring diagrams, Instrument hook up drawings, components drawings, cable routing, Cable trench, as built drawings.2. Following specifications and calculations to create various technical drawings.3. Self-motivated draughtsman who can work alongside a number of specialists at our ...