1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
Roll & Responsibility:
Purchase Voucher Materials, Job work, Services Verifying & Signing voucher.
Tour Advances Checking & Tour Expenses Verifying as per rule & approving
Travelling Expenses Export
Factory Imprest Checking and assign to account head
Domestic Vendor & Customer Clearing
Branch Imprested for all branches
Customer & Vendor Reconciliation
General Ledger Reconciliation (factory Imprest, Tour Advances, Branch ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 4.00 LPA
WorksAsInward Quality Engineer & MonitoringChild Part Quality.
ConductingAuditsAt Supplier Endsi e.Projection WeldingAudits,MIGWelding& Head
PipeMfgAudits,System Audits.
AdherenceTo InwardsGaugesCalibration Plan & CorrectingIf NCObserved ,
Maintaining Supplier PPM Records& CommunicatingWith Concern Also Preparing Vendor
Meet Presentation
MonitoringRaw Material TestingPlan (Monthly) & CommunicatingTo Concern If NC’s
Observed Also Sending Special Raw Material For TestingAt CustomersEnd (BAL).
MonitoringAnd SolvingQuality Related ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 10.00 LPA
Development of New Products from Drawing to Stream Line Production.
Drawing Study & Feasibility study.
Design of Process Flow for assembly as well as loose parts.
Budget preparation & approval from management for New Projects
Project Planning, Machinery & Tools planning for new Project
Preparation of PFMEA & Control Plan
Vendor identification & Enquiry of quotations for Press Tools, Fixtures & Gauges
Tool costing & cost finalization with supplier
Design, concept discussion & approval for press tool , Fixtures & Gauges
Manufacturing schedule & Development plan for the tools & Fixtures
Floor plan layout & material handling plan
Operation sheets D.R. documents (PPAP) discussion & submission to the customer (Bajaj Auto Ltd.)
Physical tooling status, review & Conduct Trials for press tools, Fixtures & SPMs
SIR preparation, correction & approval from Customer
Preparation of Prepilot, Pilot batch & production trial run
In house production line layout as per floor plan
Mass production run
Final Process details hand over to the Production
Time study & Line Balancing
Skill : Press Shop Sheet Metal Product Delevement ,
Job Location : Waluj , Aurangabad
For more details call on 9765567699
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
Experience of teaching & programming an ABB, Panasonic robot.
Trouble-shooting & modification of Allen-Bradley Control Logix PLC programs, Mitsubishi PLC program.
Good knowledge of Allen- Bradley PLC5, SLC.
Working on servo motor and it's drive (Mitsubishi servo system).
Modification in electrical panel and PLC programs for eliminate the breakdown.
Looking over all the maintenance robots, ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
150000.00 LPA TO 150000.00 LPA
Consulting Gastroenterologists and EUS/ERCP (Full Time)
DESCRIPTION
We are actively seeking 4 fellowship trained, graduating or experienced General GI and EUS/ERCP physicians. This position requires experience with high complexity cases and candidate should be familiar with masses, dilated ducts, surgical biliary diversion, necrotizing pancreatitis, pancreatic fistula, advanced endoscopy with endoscopic mucosal resection and ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 9.00 LPA
Planning & Implementation of PM, B/D activity of plant machines (monthly, quarterly, yearly).
Preparation of TBM/CBM plans for Critical/key equipments
To solve the breakdown problem of all Co2 welding, Robots (Fanuc &Panasonic make) machines, fine boring machines, SPM, Over head conveyors, Utility and other plant equipments.
Reviewing the requirement of critical and consumable maint. spares.
Reviewing of DWM in department.
Calibration of all types of pneumatic equipments.
To keep record of test certification of material handling equipments and compressor receivers.
Implementation of 5-S & TPM activities.
Proper utilization of man resource as per skill level.
Monthly maintenance CRM reporting to management.
Design and Development of machines to increase the productivity.
To manage maintenance expense within granted budget.
Maintaining documentation work related to ISO standard.
Monitoring & controlling on repair cost, energy saving & cost saving projects.
Job Location: Waluj Aurangabad
For More details call on 9765567699
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit.
Work as per the guideline of TPM/TS
Development and mfg. jig and fixture and establishment for production
Decided optimum cycle time for hydraulic and pneumatic testing
Co-Ordinate with PPC department for smooth production running
Set the robotic line as per the targets and balance the bottle neck operation
Overcome all the minor abnormality related to fixture during trial.
Set the TPM target for quality, maintenance, stores and production.
Arrange for all resources including raw materials, man power and facility required.
Handling overall press shop production for daily production targets
Overall responsibility of welding sub assembly of floor board and running board assembly
PROCESS follows with safety and through with safety and work permits.
Achieving the planned targets without Compromising the quality and quantity
Working as per various standards like ISO9001&Tsi6949-2002 system
Preparation of daily & Monthly reports
Co-Coordinating with Stores, QC, QA, Maint .In day to day activity
Awareness of seven QC tools to improve quality problems
Handling 4M for achieve desired production targets
Job Location : Waluj MIDC Aurangabad
For more details call on 9765567509
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.20 LPA TO 3.00 LPA
Designing Machines as per customers requirements, contact with customers.
Worked in designing team under experienced Design Engineers.
Worked in the field of Manufacturing, Technical Support, & CAD designing.
Associated support for design in product development, CNC Turning, VMC milling
operations and castings.
Evaluation of CAD data and Specification for Manufacturing.
3D modeling on solidworks and assembly, simulation and ...
2 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 3.00 LPA
Good Knowledge of CNC Programming / Operating
Good Knowledge of Jig Fixture
Operation of all Conventional, NC, and CNC machines in tool room.
Tool Jigs & Fixture, etc.
Manufacturing processes & process planning.
CNC programming of HAAS, SIEMENS & FANUC controls.
Hands on experience of CNC Prog. & machining (HAAS, FANUC, SIEMENS, ROBOFILL, ELECTRONICA, CHARMILLS TECH., AGIE-CHARMILLS SRP EDM CONTROLLS).
Process sides maintain all parameters on daily basis, implementation of GAUGE R&R system, PDCA & FMEA activity.
Implementation of KAIZEN.
Total manufacturing process i.e. CAM software, CNC operation, imaging, plating etching, masking, HAL or solder process, BBT and FQC.
Conduct trials for new supplier /new Machines and process validationof this product /Machine.
Check and maintain all documentation on daily basis.
Daily rejection, rework analysis and production analysis by maintaining records of production, rework, rejection, downtime and absenteeism, prepare shift production summary.
Job Location: Waluj MIDC, Aurangabad
for More details call on 7249840333
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.60 LPA
Roll :
Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC Circuit designing, preparing SLD, Panel layout & Electrical schematics.
Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval communicating with clients for understanding and detailing of drawings
Supporting to other teams ...