3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
4 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 20.00 LPA
A General Manager (GM) for a Power Plant within a steel manufacturing company (often a Captive Power Plant - CPP) drives operational efficiency, safety compliance, and power reliability. Key duties include managing coal procurement, optimizing fuel efficiency, achieving electricity generation targets, leading maintenance (preventive/breakdown), and ensuring environmental compliance.
Key Responsibilities
Plant Operations & ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Job Description:
General Manager (Power Plant) MECHANICAL - BROWN FIELD PROJECT
60 MW POWER PLANT , 250 TON AFBC BOILER
The general manager will be responsible for overseeing the efficient and effective operation of a power plant. Reporting to the Managing Director, the General Manager will lead a team of professionals and ensure compliance ...
1 Opening(s)
2.0 Year(s) To 15.0 Year(s)
2.40 LPA TO 15.00 LPA
Urgent Requirement for AGM/GM for power plant afbc cfbc boiler at Raipur location
To get maintenance data for Boiler’s & Turbine areas and evaluation of maintenance performance.
To continuously monitor/measure contract benchmarks, propose required corrective actions to sites.
To maintain centralized data like equipment details, monthly maintenance performance data etc.
To plan required External ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
Company: Maa Kudargarhi Group
Department: Projects – Mechanical / DRI
Location: Tilda, Raipur, Chhattisgarh (Plant/Project Site)
Employment Type: Permanent / Full-Time
Project Execution & Lifecycle Management: Drive the complete mechanical project lifecycle for expansion or greenfield/brownfield setups.
Erection & Commissioning: Supervise structural alignment, mechanical erection, installation, and cold/hot commissioning of heavy plant machinery.
Cross-Functional Coordination: Work ...
- 1. Technical & Plant Equipment Keywords Core Processes: Dri (direct Reduced Iron)
- Sponge Iron
- Rotary Kiln (350 Tpd / Large Capacity)
- Steel Melting Shop (sms)
- Induction Furnace
- Ccm
- Ferro Alloy Plant
- Whrb / Cfbc Boiler
- Power Plant Auxiliaries. Heavy Equipment & Machinery: Kiln Drives & Gearboxes
- Rotary Coolers
- Material Handling Systems
- Conveyors
- Crushers & Screens
- Fume Extraction Systems (fes)
- Cooling Water Systems
- Pumps
- Compressors
- Cold Commissioning
- Trial Runs
- Plant Stabilization
- Punch-point Closure
- Structural Alignment
- Utility Piping
- Mechanical Design Review
- Root Cause Analysis (rca)
- Resource Deployment
- Milestone Tracking
- Cost Optimization
- Budgeting
- Site Safety (hse)
- Metallurgical Plant