1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Position base :- Bikaner (Pugal) ,Rajasthan
Working Mode at Project Site Locations :- 6 days WFO (Weekly Off on Sunday )
Note :- Flexible and open to be posted on other site location in Rajasthan (Barmer /Bikaner) at the time of joining as per project & business requirement even if position is raised for ...
2 Opening(s)
5.0 Year(s) To 8.0 Year(s)
5.50 LPA TO 6.00 LPA
Job Summary
The QA/QC Electrical Engineer will be responsible for ensuring that all electrical installations and systems executed at site comply with approved drawings, project specifications, applicable quality standards, and statutory regulations. The role involves inspection, testing, documentation, commissioning, and coordination to ensure quality compliance throughout the project execution.
Key Responsibilities
Quality Assurance ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
20.00 LPA TO 25.00 LPA
A General Manager (GM) for a Power Plant Project within a steel manufacturing company is a senior leadership role focused on leading the planning, execution, and commissioning of captive power projects (typically WHRB or CFBC boilers) to ensure uninterrupted power supply to the steel melting shop (SMS), furnaces, and rolling mills.
Job ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
18.00 LPA TO 20.00 LPA
Responsibilities of project basic Engineering, details engineering,construction andcommissioning.● Selection of electrical equipment compatible with project and maintenance purpose.● introduce New design guidelines which to be used for projects and maintenance forselection of equipment.● safety and quality maintained at site execution.● timely complete project for handover and smooth process.
Responsible for the ...
1 Opening(s)
18.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 50.00 LPA
Job Purpose:
To lead end-to-end execution of large-scale wind power projects at site, ensuring timely commissioning, cost control, quality delivery, and adherence to safety and compliance standards, while leading multi-disciplinary site teams.
Key Responsibilities:
Project Leadership & Execution
Overall in-charge of site execution for wind projects of 200 MW+ capacity.
Drive end-to-end execution including civil, electrical, ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
Job Desigination - Electrical Engineer – Lift Commissioning
Responsibilities:
Handle wiring, programming, and commissioning of lifts
Program lift controllers, smart COP displays, and safety features
Troubleshoot electrical systems during installation and handover
Work with software and design teams for advanced control features
Requirements:
Diploma/B.E./ITI in Electrical or Electronics
2–3 years’ experience in commissioning elevators
Experience with VVVF drives, controllers, and ...
3 Opening(s)
8.0 Year(s) To 10.0 Year(s)
12.00 LPA TO 18.00 LPA
Division
PMT
Position
Project Manager, experienced in the construction of Cross-Country Pipelines
Job Location
Saudi Arabia
Year of Experience
8 - 10 years
Education
Engineer – preferred Mechanical Engineer
Roles & Responsibility
Seeking a Project Manager experienced in the construction of Cross-Country Pipelines.
The ideal candidate should have deep experience in Engineering, Procurement and Construction of pipelines.
Essential duties:
(1) Project Management Professional, Oversee ...
25 Opening(s)
3.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Job Description
1) Be able to complete the Move in, installation, commissioning, repair and maintenance of the company's equipment under the guidance of SOP and installation video;
2) Commissioning in strict accordance with the requirements of the commissioning manual, and keep relevant data files;
3) Establish complete equipment debugging and maintenance file records ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 3.60 LPA
Urgent Requirement of Instrument Engineer for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Turbine control system testing, tweaking and commissioning
Plant DCS system (Boiler and BOP) testing, ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Duties & responsibilities:
Quality Assurance and Quality Control:
Develop and implement QA/QC processes and procedures for mechanical jigs, fixtures, pendants, and SPMs.
Inspect incoming materials, in-process manufacturing, and final products to ensure they meet design specifications and quality standards.
Perform root cause analysis for quality issues and implement corrective actions.
Maintain detailed records of inspections, ...