15 Job openings found

1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
12.00 LPA TO 15.00 LPA
Manage Operationnal Quality with sales team – Disbursement relatedquality like Hind Sighting, File dispatch, correct documents andrepayment related quality like ENach drive, E-KYC, Madate curing. Manage Collection Quality of business like FEMI, NS, 6MOB, GFR withhelp of own team and frontline team. Manage Business Development related activities like Login ConversionReviews, ...
2 Opening(s)
4.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 7.00 LPA
Description:   The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Hi PFB: Look after the inventory control of the spares, which are required for the machine.                                                                                                                  *   worked on process and product layout of the plant.                                                                        *  Welding and gas cutting works, *   Look   after  the maintenance of the machine and tools.         *   Expose to work on R&D activities. and Handling all kinds ...
1 Opening(s)
0 To 3.0 Year(s)
1.40 LPA TO 1.80 LPA
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 4.00 LPA
Requirement For Chemical Company,Corporate Office Vashi Navi Mumbai,Sales & Marketing Engineer,Diploma, Civil Engineer,Job Location, Mumbai And Dehradun, Uttrakhand Pradesh,Exp Above 2 To 6 Years, Field work sales, For chemical sales,Ctc 3 L, To 5 L, P A,Water proofing, Industrial Flooring, Decorative Emulision, Admixtures, Concrate Repair,Procetive cotting, Road Surfacing,Floor hardener, curing ...
5 Opening(s)
0 To 15.0 Year(s)
20.00 LPA TO 40.00 LPA
Polymer synthesis and chemical modification (In-situ/Ex-situ) for new product development ? New grades of plasticizer grafted elastomer (NR, SBR, NBR, BR) by chemical modifications though grafting approach to replace commercial oil plasticized rubber ? Polymer/elastomer composite and blends, processing, mixing, compounding, curing ? Applications of polymer on extrusion, injection molding, ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 12.00 LPA
Having knowledge of compounding of rubber to metal bond product, Extrusion, Microwave curing,moulding, Fire, flame & smoke retardant, sponge product. Having knowledge about Compound preparation and related machinery (Intermix, Dispersion Kneader &Mixing Mill). Having knowledge of Rubber product manufacturing process: Compression, Transfer & Injection molding,extrusionas well as CV line profile. Troubleshooting during rubber ...
4 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.50 LPA TO 1.80 LPA
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Description:   The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Description:   The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile