1 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 1.80 LPA
An "ELECTRICAL GET JD" is a job description for an electrical engineer, specifying the responsibilities, requirements, and qualifications for the role. It outlines the duties and skills needed for designing, developing, and maintaining electrical systems, often in various industries like construction, energy, and manufacturing.
Key aspects of an Electrical Engineer's Job Description (JD):
Responsibilities:
Designing ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 6.00 LPA
Electrical engineers design, develop, and test electrical devices and equipment, including communications systems, power generators, motors and navigation systems, and electrical systems for automobiles and aircraft. They also oversee the manufacture of these devices, systems, and equipment.
Electrical engineers design, develop, and test electrical devices and equipment, including communications systems, power ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
Mechanical site engineers have a passion for solving problems and understanding the mechanics that make machines work. The following are the most common skills needed to succeed as a mechanical site engineer:
Project management - planning out the size, scope, and resources necessary to complete a project
Manual dexterity - using hand tools and ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.40 LPA TO 3.00 LPA
An Electrical Engineer Utility job involves designing, developing, and maintaining electrical systems for power generation, transmission, and distribution to ensure safe, efficient, and reliable electricity delivery. Key responsibilities include performing system analysis, troubleshooting faults, upgrading equipment, ensuring regulatory compliance, and integrating renewable energy sources. The role requires a strong foundation in electrical principles ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
Job Description
Designation:
Site Engineers - Electrical
Job Location:
Kalpana Electricals,
Ahmedabad
Department:
Service - AMC
Grade/ Level:
Direct Reporting To:
Manager / Administration at Client Office
Direct Reportees:
Technician
New Position/ Back Fill:
Back Fill
No. of openings:
1
Job Purpose: The candidate shall be responsible for overall service to the customer. Also he will be responsible for coordination with client in initial process stages like ...
1 Opening(s)
2.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT AT BHILAI LOCATION
URGENT REQUIREMENT FOR ELECTRICAL INCHARGE FOR REPUTE D PELLET BENEFICIATION PLANT ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.80 LPA TO 7.20 LPA
Electrical System Engineer:1. Knowledge of electrical fundamental i.e. switchgear, wiring, crimping etc.2. Selecon of electrical items according to requirements.3. Evaluang systems’ safety, reliability, and performance.4. Design, control, and implement electrical systems and products5. Develop manufacturing processes according to global engineering codes and standards.6. Manage Electrical engineering works and deliver them ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
5 Opening(s)
3.0 Year(s) To 12.0 Year(s)
3.00 LPA TO 30.00 LPA
Essential Job Duties:
Performs electrical discipline work which involves the preparation, interpretation or review of calculations, specifications, electrical layout plans including lighting and grounding systems.
Participates in one or more of the following:
ETAP/Smart Plant Electrical (SPEL)
Equipment design and development
System design, including concept sketches and layouts
Preparation of specifications and design calculations
Reviewing and ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
7.20 LPA TO 9.00 LPA
Key Responsibilities• Preparation of HT & LT, transformer yards, bus duct layout, electrical room, rising main layout, DBmounting and section details.• Main single line diagram, lighting and raw power layouts, lightning protection layout, UPS & rawpower distribution layouts.• Preparation of fire alarm, access control, closed-circuit television, and public addressingsystem schematic ...