1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Main Responsibilities
1) Review the system designs, Drawings and specifications to ensure compliance with project requirements and industry standards.
2) Assist in the follow up of materials procurement for the installation and operation of solar systems, including solar panels, inverters, mounting structures and electrical components from EPC.
3) Joint inspection of material receipts at site by ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 4.80 LPA
We are currently looking for foreman electrical for reputed POWERNPLANT at raipur location.
candidatePlans, supervises, and performs all phases of installation, maintenance, repair and inspection of electrical systems and service work
· Salary 40000/- to 45000/- PM
1.Responsible for electrical repair & maintenance.
2.Responsible for preventive maintenance of all machines of various departments.
3. Responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.20 LPA
An Executive Assistant (EA) to the Executive Director (ED) in a steel plant provides high-level administrative, operational, and strategic support to ensure the efficient functioning of the ED’s office and the overall plant operations. This role requires acting as a liaison between the ED and other departments, such as production, ...
1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
7.20 LPA TO 8.40 LPA
Job Description (JD) for a Project Manager – Airport Electrical Works at Udaipur airport site:
Job Title: Project ManagerLocation Keshod near PorbundarReporting To: DGM Projects / GM - Projects / VP OperationsCompany: Power and Instrumentation (Guj) Ltd (A GroupPower Company)Employment Type: Full-Time, Site-Based
Role Overview:The Project Manager will be responsible for end-to-end ...
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
3.00 LPA TO 5.40 LPA
1.Responsible for electrical repair & maintenance.
2.Responsible for preventive maintenance of all machines of various departments.
3. Responsible for operation of Utility machines in his shift.
4.Required ITI/NCVT passed Electrician with at least 7 to 10 years of experience with reputed factory/company. Candidate should have experience in LT/HT line, electrical maintenance.
Attending to all ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.20 LPA TO 5.40 LPA
1.Responsible for electrical repair & maintenance.
2.Responsible for preventive maintenance of all machines of various departments.
3. Responsible for operation of Utility machines in his shift.
4.Required ITI/NCVT passed Electrician with at least 7 to 10 years of experience with reputed factory/company. Candidate should have experience in LT/HT line, electrical maintenance.
Attending to all ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
8.00 LPA TO 9.00 LPA
Executed atleast 1 residential building. Manages contractor and sub contractorsShould be aware of low side electrification works,
Transformer, DG and Panel installation, termination, testing and commissioning.
Must be conversant in external electrical works.
Should have knowledge of ELV systems executed in residential buildings
Preferred Skills:
Experience in high-rise residential or commercial projects.
Knowledge of energy-efficient systems ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 20.00 LPA
We are looking for a highly organized and experienced Project Manager to lead renewable energy infrastructure projects, including power evacuation systems, pooling substations, transmission lines, and associated electrical works.
The role involves end-to-end project execution from planning to closure, ensuring timely delivery within scope, budget, and quality standards.
Develop detailed project plans ...
- Project Management
- End-to-end Project Execution
- Project Planning
- Project Scheduling
- Project Lifecycle Management
- Scope Management
- Time Management
- Cost Management
- Resource Allocation
- Milestone Tracking
- Project Monitoring & Control
- Project Closure
- Renewable Energy Projects
- Power Evacuation Systems
- Transmission Lines
- Electrical Infrastructure
- Epc Projects
- Solar Power Projects
- Wind Energy Projects
- Grid Connectivity
- Electrical Systems
- Civil & Electrical Works
- Site Execution
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Job Responsibilities:
Manage the Electrical works for the successful implementation of the project and after completion of project etc.
Co-ordination with Site and EPC Contractor for resolution of design and engineering interfaces, ensure timely works execution and as per required quality and standards
Study and review of Engineering documents and drawings of Electrical ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Urgent Requirement for Electrician For SMS for Reputed Steel plant at Raipur location
2.Responsible for preventive maintenance of all machines of various departments. 3. Responsible for operation of Utility machines in his shift. 4.Required ITI/NCVT passed Electrician with at least 4 to 6 years of experience with reputed factory/company. Candidate should ...