1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
JOB DESCRIPTION
Should have hands on experience on detail engineering & Mechanical design calculations of static process equipment like pressure vessels, columns, reactors, storage tanks, heat exchangers etc. in accordance with Tender Specifications, national and international Codes and regulations like ASME SEC VIII DIV I, ASME SEC VIII DIV II, TEMA, ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Walk in Interview for Shift Incharge mechanical maintenance for sponge iron for reputed integrated steel plant at Orissa Location.
Lead the total Mechanical maintenance team of TPD sponge iron plant for the maintenance of various equipments and machineries used in the plant which includes 100TPD Kiln, Cooler, screw compressors, lobe compressors, ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
Urgent Requirement for Assistant Manager Electrical SID for Reputed Steel plant at Bilaspur location.
In rotary kiln: - Maintenance of motor used for kiln main drive, auxiliary drive, shell air fans, coal injector, and thermocouple and transmitters.
Cooler section: - Maintenance of motor used for cooler drove.
Product separation building: - Maintenance of ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Qualification: BE Mechanical, DME, BSC with Certificate course in Auto CAD (Mechanical Draftsman)Work experience: 4 to 8 Yrs designing exp of HVAC projectsIndustry: Engineering / HVACGender: Male/Female, Age: 25 to 40 yrs, Salary: Negotiable for right candidate
Job Description / Responsibilities:HVAC, AHU, Air washer Design / Drawing for Various Projects .Heating / Cooling ...
1 Opening(s)
0 To 4.0 Year(s)
4.00 LPA TO 6.00 LPA
Introduction – Dyson Dyson is a global technology company with a unique philosophy, led by James Dyson. We transform every category we enter with radical and iconic re-inventions that work, perform and look very different. As a technology and engineering pioneer, we currently operate in the categories of Floorcare, Environmental ...