1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
Looking for challenging role If you really want to make a difference -
make it with us Siemens Energy is focused on helping customers navigate
the world's most pressing energy problems. As a world leader in developing
and producing the most advanced engineering technologies, we improve lives and
further human achievements worldwide, while also ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Knowledge Mechanical maintenance of VMC and HMC , grinding machines, CNC machines, Robotic Washing ,CNC Washing, Honning Machine, central coolant system.Knowledge of fixture (machine shop, Engine assly & testing/dressing) of engine shop
Knowledge of Replacement of spindle, ATC unit, Hydraulic and pneumatic circuit diagram reading and diagnosis. Spindle run out correction ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.00 LPA TO 3.00 LPA
Knowledge Mechanical maintenance of VMC and HMC , grinding machines, CNC machines, Robotic Washing ,CNC Washing, Honning Machine, central coolant system.Knowledge of fixture (machine shop, Engine assly & testing/dressing) of engine shop
Knowledge of Replacement of spindle, ATC unit, Hydraulic and pneumatic circuit diagram reading and diagnosis. Spindle run out correction ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
7.20 LPA TO 8.00 LPA
well-honed expertise in Maintenance field with handling of Machine shop machines like CNC, VMC,HMC,HOBBING,(RoboDrill), Weldshop & Micromatic Grinder & Center Less Grinder (HMT), Spindle Repairing & press shop etc.
Maintaining & breakdown handling of all CNC, VMC,HMC, SPM, Robots, Induction hardening and,Hyraulic Press,MIG welding Robot( Motoman,Yashkawa),Conveyor, Body & valve leak testing,flattening ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 3.60 LPA
Ass. Engineer - block mill manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 4.00 LPA
Urgent Requirement for Automobile Maintenance for Bauxite Mine at Ambikapur, CHHATTISGARH.
Repair, Maintenance, Trouble shooting, performance monitoring, Equipment Overhauling,
Operation of Heavy Earth Moving Equipment’s i.e. Dumpers, HYVA, Loaders, Excavators, Forklift etc.
used in plant operation for units such as Steel Plant(DRI, Blast furnace, SMS, Rolling Mill, Coke oven, Raw material transportation & ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
We are currently looking for utility head for reputed steel plant at sambalpur location.
Responsible to make Plant maintenance schedule. 2. Plant maintenance including mechanical, electrical, instrumentation.3. Will be responsible for timely preventive, predictive and breakdown maintenance activities. 4. Will need to be competent in Electrical/Hydraulic Mechanical Maintenance. 5. Will maintenance officers and technicians. Experience in TPM activities will be preferred. 6. Will be required to face ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 4.80 LPA
HPS-2023/279
Utility Head
male
1
5 to 7
ITI/DME/DEE
Operation and maintenance of electrical Substation equipments like OCB, HT breaker Transformers & RMUs, distribution of electrical system, DG sets etc.
Operation and maintenance of all C & D zone Rides and utility .
Operation & Maintenance of AC & DC motors, ,RWH,Water filtration plant.
Working with AC & DC ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Preventive Maintenance Planning Spare Parts management Erection commissioning of Plant Machinery Knowledge of OHS and EMSMaintenance cost.Knowledge of Pneumatic and Hydraulic system.Working Experience with rubber industries will preferable for extrusion Process Utility maintenance, like Pumps, Motors, compressors, chilling plant, transformers, AFD, PLC, Power line Maintenance, HT line L.T.Panel ACB,VCB etc ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Preventive Maintenance Planning Spare Parts management Erection commissioning of Plant Machinery Knowledge of OHS and EMSMaintenance cost.Knowledge of Pneumatic and Hydraulic systems.
Working Experience with rubber industries will be preferable for Steel Tube Process Utility maintenance, like Pumps, Motors, compressors, chilling plants, transformers, AFD, PLC, Power line Maintenance,
HT line L.T.Panel ACB, ...