1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.60 LPA
Design & Develop: Create and modify injection mold designs based on product specifications.
Tooling Management: Oversee the fabrication, maintenance, and repair of molds.
Process Optimization: Improve mold performance, ensuring quality and efficiency.
Troubleshooting: Identify and resolve mold-related issues during production.
Documentation: Maintain detailed records of mold designs and modifications.
Collaboration: Work closely with design, production, ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 18.00 LPA
Job Purpose
Manage the human and technical resources in plant, optimizing quality, costs, delivery and productivity and also lead the continuous improvement and projects. Organize and coordinate activities between operational and administrative areas in order to ensure goals are achieved. This role will include overall responsibility for production output, facilities and ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 14.00 LPA
Job Description:
Strategic Planning:
1) Develop and implement strategic plans for maintenance activities based on industry best practices.
2) Manage and optimize maintenance schedules to ensure maximum plant, machinery, and utility availability while minimizing costs.
Preventive Maintenance:
1) Plan and execute preventive maintenance activities for moulds, ensuring their optimal performance.
2) Monitor the availability of moulds ...
1 Opening(s)
3.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 4.80 LPA
Mold engineers are responsible for designing and engineering molds and dies used in manufacturing processes, especially in plastics molding. They may work on a variety of projects, including blow molds, injection molding, and die-casting
Molding is a manufacturing process that involves shaping a liquid or malleable raw material by using a fixed frame; known ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Control the breakdown maintenance and maximum utilization men and m/c.
To make annual preventive and predictive maintenance schedule of machines and revised as per requirement.
Implementation of conditioned based maintenance.
Poke –Yoke and continuous in
Team leader of kaizen implementation in the Plant.
Daily morning meeting with production department.
Major break down analysis report monthly basis.
Allocation ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 2.40 LPA
Domestic And Industrial Wireing All Electrical Problem Attend Maintenance of motor . 3 Phase Induction Motor Connection Maintenance of all LT panel All Portable Equipment Checkknowledge of injection molding machine maintenance is must Electrical maintenance
Must be ITI Electrician with 2-3 year in injection molding machine maintenanceComputer knowledge work in in shift.
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.40 LPA TO 1.70 LPA
ITI Electrician with 1 to 3 yrs experience as electrician in maintenance department.Knowledge of maintenance of injection mold / rubber molding machine maintenance is added benefit. To carry out preventive and break down maintenance of injection molding machines. Experience in hydraulic and pneumatic equipment and utility equipment maintenance.Conducting periodic maintenance ...
1 Opening(s)
9.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 7.00 LPA
Job PurposeThe main purpose is to design, develop and implements optimal, cost-effectivemanufacturing of moulds along with post moulding operations, in accordance with product specifications and quality standards.
Responsibility: Responsible for all new products and moulds from scratch to final production start up. Responsible for Techno commercial activities. Doing market survey, product cost ...
2 Opening(s)
0 To 3.0 Year(s)
1.20 LPA TO 1.80 LPA
Roles and Responsibilities
Industry: Injection Molding - Plastic Manufacturing
Position: Quality Engineer / Inspector for Female
Year of Relevant Experience in Plastic Industry Quality Department: 0 to 3 Years
Educational Qualification: Diploma / BE / B Tech/BSc Cipet
Professional Qualification: 0 - 3 Years CIPET
Should have experience in Quality
Should have experience in Computer
Profile Focus will ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.00 LPA TO 2.50 LPA
of Preventive Maintenance as per scheduled.
Spare Parts Planning and Maintaining of key Spares for reducing the Breakdown trends. Injection molding , blow molding, PVC coating machine, water circulation plant Utility machine.
Clint meeting, AMC documentation VRB system, DG set, Fire safety system
Continual improvements to minimize the Breakdowns and maintenance cost by ...