1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic / Electrical / Mechanical
Gender: Male
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as an associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase, Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Shendra MIDC, Aurangabad
for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic
Gender: Female
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase , Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Chitegaon MIDC , Aurangabad
for more details call on 7249840222
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.50 LPA
Any Graduate with 2-5 yrs of Experience in handling store activites for honda spare part.- Managing whole Spare parts unit in a service station. Maintain proper inventory.- Stock parts in systematic way and label bins/racks. - Tally the part number with physical material and requisition.- Handling inventory and dispatch.- Good ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
24.00 LPA TO 36.00 LPA
gm hr
looking all hr activity on plant and corporate
exp on similer industries 25 to 35 tear
E
Hide
Functional Area *
Select Functional Area
Accounts / Finance / Tax / CS / Audit
Consulting / Agent / Freelancer
Architecture / Interior Design
BFSI, Investments & Trading
Journalism, Content writing & Editorial
Top Management, Corporate Planning / Consulting
Engg Design / R&D / ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.80 LPA TO 7.20 LPA
Job Summary 1
A Plant Manager is responsible for directing, coordinating, and managing the overall plant operation. Assures that the plant's production objectives are achieved at the lowest cost consistent with quality requirements while maintaining compliance with Federal, State, and Local Safety and Environmental regulations and laws. Delegates responsibility and works through the ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 12.00 LPA
Qualification : BSc / MSc Chemistry/ Organic Chemistry/ Biotechnology
Requisite Technical Competencies:
8-10 Years of exp. in LABORATORY CHEMICAL MANUFACTURING.
Handled various types of chemical salts and its related production activities
Well versed with Organic and Inorganic chemistry
Should have knowledge of HPLC/GC, Karl Fischer etc
Roles Responsibilities:
The relevant chemical processes used in manufacture, such as purification, ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
Duties & Responsibilities 10
Maintain a high level of knowledge regarding air sealing and direct installation
Manage quality control for all installations performed by field staff
Coach Field staff to improve services and train them on new technologies and techniques
Daily travel to pre-scheduled jobs
Work with program and corporate staff to create effective and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
Job description
Maintenance of all electrical equipment’s in the area, Breakdown maintPreventive maintenance, conditional monitoring of all the equipment’sMaintenance and modification in SimaticCreation ,modification ,and testing of logic in Logicad PLCs,X-pact
Required Candidate profile
Erection Installation and commissioning of Electrical equipment’s i.e (MV/LV Motor, MV /LV Drive, HT/LT transformers ,11KV witch Boards, DG ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
7.00 LPA TO 8.00 LPA
Job Description
Description:
Job Description
Description:
Will be responsible for handling business .
Segments to be handled, Hospitality, Corporate, Retail (MTO and General Trade).
1. Age-45
2. Education –MBA, desirable
Should have handled GT, Modern Trade and Insititutional sales.
4. Those who have worked with Premium products and niche products , including high end cosmetics, will have an added ...
1 Opening(s)
8.0 Year(s) To 11.0 Year(s)
10.00 LPA TO 13.00 LPA
Responsibilities:
Build and maintain a positive culture of engagement in EH&S.
Ensure compliance with all safety and environmental legislation. Monitor legislation changes and ensure any new requirements are implemented.
Participate in reviews of third-party compliance audits in collaboration with site and business unit EH&S leaders.
Maintain an effective EH&S management system for the site/facility.
Develop ...