1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.00 LPA
Position: Shift-In Charge (Pilot Plant)
Location: Vapi
Experience: 3 - 5 Years
Industries: Chemical
Responsibilities:
Ensuring a safe and efficient work place is maintained at all times
Support, comply and ensure complicity with Health & Safety regulations, the Company logbook, Quality and Environmental standards,and all other Company policies and procedures.
Achieve the ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
8.00 LPA TO 10.00 LPA
Job Description
Review of P&IDs and Generation of all type of control engineering documents, PLC & HMI Specifications, Panel drawing, System architecture, Operation Philosophy Cause & Effect diagrams. Etc
Programming experience in Ladder logic / Functional block diagrams / Structured text etc.
HMI & SCADA configuration
Understanding & Preparation of Engineering drawings, Instrument Index, ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
14.00 LPA TO 14.00 LPA
Job Description Summary
Lead Engineer Accessories Instrumentation will leverage his or her engineering and leadership skills to develop design packages that relate to the upgrade or retrofit of gas or steam turbines and generator accessories. They will mainly focus on the design integration of electrical and instrumentation systems with control hardware ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...