1 Opening(s)
20.0 Year(s) To 30.0 Year(s)
24.00 LPA TO 30.00 LPA
A General Manager (GM) of Pipe Production (or Plant Head) is a senior-level executive responsible for overseeing the entire manufacturing operations of a pipe production facility, including plastic (UPVC, CPVC, HDPE) or steel (ERW) pipes. This role ensures maximum production efficiency, quality compliance, and cost optimization, often acting as a profit ...
2 Opening(s)
0 To 1.0 Year(s)
2.00 LPA TO 2.16 LPA
An Electrical Engineer Maintenance Trainee assists in repairing, inspecting, and maintaining industrial electrical systems, equipment, and machinery to ensure operational efficiency. They troubleshoot faults, perform preventative maintenance, follow safety protocols, and document technical reports, gaining hands-on experience in PLCs, motor controls, and power systems.
Key Responsibilities
Preventive Maintenance: Assist in executing scheduled maintenance tasks ...
10 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 4.00 LPA
🔧 Key Responsibilities
Operate and monitor Blister Packing Machines (Alu-Alu / Alu-PVC).
Perform machine setup, changeover, and format adjustments as per production plan.
Ensure proper feeding of materials like PVC, Aluminum foil, and printed foils.
Conduct in-process checks and maintain batch records as per SOP.
Ensure compliance with cGMP, safety, and quality standards.
Troubleshoot minor mechanical ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Key Rsponsibilities :o Understanding the technical requirement of a project and preparing the project specification documents.o Performing structural design and analysis calculations as per governing codes, standards & regulations, engineering formulas, best engineering practice and skill / experience.o Use computer-assisted engineering and design software and equipment to prepare engineering design ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Job Title: Chemical Plant OperatorLocation: Sayakha GIDC, Bharuch.Job Type: Full-timeExperience: 2 to 3 years in chemical plant Utility operations or industrial manufacturingJob Summary:We are seeking a skilled Chemical Plant Utility Operator to oversee and manage the operations ofour chemical processing facility. The ideal candidate will be responsible for monitoring equipment,ensuring ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 0.00 LPA
DUTIES & RESPONSIBILITIES
Understanding the technical requirement of a project and preparing the project specification document.
Sizing of static equipment considering the layout and project requirements.
Design and Detail Engineering of Steel Tanks & Vessels according to ASME SEC VIII, Roark’s Formula, API 650, API 620, AWWA D100, UL-142, UL-58, Shell DEP, etc)
ASME ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
An Assistant Purchase (or Purchasing Assistant) in a fabrication plant is responsible for supporting the procurement department by ordering raw materials (steel plates, pipes, structural sections), consumables (welding rods, gases), and MRO (Maintenance, Repair, and Operations) spares to ensure uninterrupted production. This role requires balancing cost-effective purchasing with timely delivery in ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 6.00 LPA
A Senior Quality Engineer in a fabrication plant is responsible for leading quality assurance (QA) and quality control (QC) activities to ensure fabricated metal products, welding, and assemblies meet client specifications, industry standards (e.g., ASME, API, AWS), and ISO 9001 standards. This role requires hands-on shop floor inspection, managing non-conformances, conducting ...
5 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.64 LPA
A PEB (Pre-Engineered Building) Erection Engineer manages on-site installation, ensuring structural components like columns, rafters, and sheeting are erected safely, accurately, and on schedule. Responsibilities include interpreting technical drawings, coordinating crews, ensuring quality compliance, and managing safety protocols (especially working at heights).
Key Responsibilities:
Site Supervision: Oversee the entire erection process, from foundation checking ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
📌 Key Responsibilities
Process Engineering & Design
Develop water and wastewater treatment process designs using engineering principles (e.g., biological, chemical, physical treatment methods).
Prepare Process Flow Diagrams (PFDs), Piping & Instrumentation Diagrams (P&IDs), mass/energy balances, and equipment sizing.
Select appropriate treatment technologies (e.g., STP/ETP/WTP, MBR, MBBR, RO, UF, ZLD, filters, ion exchange).
Perform process calculations ...