21 Job openings found

1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Production Planning - Preparing monthly production for Finished goods (CV-PSR & TBR Tyre), to meet the sales requirement, based on sales order/Forecast from different sales channels- Capacity planning - work on plant capacity, DE-bottleneck based on product-mix changes, Layout design & modification.- Stock planning for multiple line up, to ensure ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
12.00 LPA TO 15.00 LPA
  Plant Capacity:20Mw 110tph Design a plan of action & review mechanism to achieve targeted operation parameters- Cost Optimization in R&M and O&M activities- Ensure start up and shutdown procedures are meticulously followed- Trip and failure analysis and take preventive action- Review and update Manuals/ SOPs of O&M, Quality, Safety etc., and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
Position: Press Shop Incharge Education : DME / BE - Mech / Prod Experience: DME - 8 to 10 Yrs & BE - 5 to 6 Yrs. Budget: 5.50 LPA Candidate Profile :  Graduate in Engineering from a premier institute. Experience in relevant field / Our sized group. Exposure in Heavy Duty Press Shop - Production. Having Hands-on ...
2 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.20 LPA
Hiring for Sr. Engineer For Weld Shop in Auto component Manufacturing Industry Candidate profile: Graduate in Engineering from a premier institute. Experience in relevant field / Our sized group. Exposure in Heavy Duty Press Shop - Production. Having Hands-on Experience of all kinds of press machines, Dies, Die Set Up, Production Planning. Exposure of Press Shop Automation, ...
1 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 2.50 LPA
JOB DESCRIPTIONOversee production planning and management activities within the organization.Develop production plan, budget and timelines according to production specifications.Determine production requirements based on plant capacity and production specifications.Plan work flow and schedules for production departments.   Role- Quality Engineer, Production Engineer, Assembly , Design , Store, purchase    Responsibilities Set daily/weekly/monthly objectives and communicate them ...
1 Opening(s)
16.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 25.00 LPA
Urgent requirement of General Manager for reputed 70 MW Power Plant at JHARSUGUDA location. Desired incumbent should be B.E / B.Tech in Mechanical/Electrical Engineering with around 15 to 20 years of experience in maintenance and operations of of 10 MW capacity power plant. Education:B.S. in Chemical or Mechanical or Electrical Engineering Experience: ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.80 LPA TO 7.20 LPA
Job Summary 1 A Plant Manager is responsible for directing, coordinating, and managing the overall plant operation. Assures that the plant's production objectives are achieved at the lowest cost consistent with quality requirements while maintaining compliance with Federal, State, and Local Safety and Environmental regulations and laws. Delegates responsibility and works through the ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 20.00 LPA
?          Hands on experience in Hydraulic, Pneumatic, Lubrication equipments. ?          Recomminionsing of 2 MMTPA Pellet plant ?          Successfully achieved 100% of total plant capacity within time limit; consistently maintaining production targets and further working on improving quality and quantity of the product. ?          Maintaining ISO standard and practicing IMS (Integrated Management System) ?          Implementation of SAP under progress. ?          Identifying the various spares and raise indent for the ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
?          Hands on experience in Hydraulic, Pneumatic, Lubrication equipments. ?          Recomminionsing of 2 MMTPA Pellet plant ?          Successfully achieved 100% of total plant capacity within time limit; consistently maintaining production targets and further working on improving quality and quantity of the product. ?          Maintaining ISO standard and practicing IMS (Integrated Management System) ?          Implementation of SAP under progress. ?          Identifying the various spares and raise indent for the ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 12.00 LPA
JOB RESPONSIBILITIES of Production Manager: Planning Production planning Resource Planning (Man, Machine, Materials) Determine production requirements based on plant capacity and production specifications.  Plan workflow and schedules for production departments. Execution Production execution Co-ordination between shift supervisors  Oversee production processes Selection of purchasing materials required for production Machine Equipment Installation commissioning of machines Monitoring  Monitor, Measure Report on Manufacturing Plans Achievements within Agreed ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile