29 Job openings found

1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 9.00 LPA
Position: Plant Manager- Robotic Shop                           Education: DME/ BE Mechanical Experience: Min 8 Years of experience fabrication sheet, metal robotic Industry Description: 1. Production: To monitor and maintain RM stock on a daily basis, To prepare Production Plan (Daily, Weekly, Monthly) considering plant capacity, To ensure production as per plan 2. Quality: To reduce Customer Complaints, to reduce IHR, to ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
Position: Plant Head - Robotic Shop                           Education: DME/ BE Mechanical Experience: Min 12 Years with Manager level at least 5 Years in Automobile industry Fabrication, robotic  Description: 1. Production: To monitor and maintain RM stock on a daily basis, To prepare Production Plan (Daily, Weekly, Monthly) considering plant capacity, To ensure production as per plan 2. Quality: ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
4.50 LPA TO 5.50 LPA
The Senior PPC Engineer is responsible for end-to-end production planning, scheduling, and control to ensure maximum productivity, optimal resource utilization, and on-time delivery of PCBs. This role involves transforming customer orders into detailed production plans, managing raw material inventory, and coordinating across departments (sales, production, engineering) to meet targets while ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.50 LPA
Job Responsibilities:- 1-Responsible to monitor and evaluate materials, manpower planning, production recording and follow up. 2-Production planning according to capacity and 100% capacity utilization in minimum cost. 3- plan work flow and schedules for production departments. 4- determine production requirements based on plant capacity and production specifications. 5- Monitor production status and ensure timely delivery.  
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
JOB RESPONSIBILITIES 1. Strategic Planning & Leadership: Develop and implement strategies to enhance plant efficiency, productivity, and profitability. Align operations with organizational objectives, ensuring short-term and long-term goals are met. Lead plant capacity expansion and modernization projects to meet market demand. 2. Operations Management: Oversee daily operations of manufacturing units, ensuring high-quality output and on-time delivery. Optimize ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Production Planning - Preparing monthly production for Finished goods (CV-PSR & TBR Tyre), to meet the sales requirement, based on sales order/Forecast from different sales channels- Capacity planning - work on plant capacity, DE-bottleneck based on product-mix changes, Layout design & modification.- Stock planning for multiple line up, to ensure ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 30.00 LPA
Position:    Site Manager Location:   Ankleshwar Experience:  15 - 20 Years Industries:  Chemical Responsibilities: Operational Leadership Lead end-to-end plant operations including Production, Maintenance, Utilities, EHS, Quality, SCM, and Administration. Achieve production targets in line with business plans. Improve plant capacity utilization and operational efficiency. Drive TPM, Lean Manufacturing, Six Sigma, and digital initiatives. Ensure smooth plant commissioning or expansion (if ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
12.00 LPA TO 15.00 LPA
  Plant Capacity:20Mw 110tph Design a plan of action & review mechanism to achieve targeted operation parameters- Cost Optimization in R&M and O&M activities- Ensure start up and shutdown procedures are meticulously followed- Trip and failure analysis and take preventive action- Review and update Manuals/ SOPs of O&M, Quality, Safety etc., and ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 20.00 LPA
?          Hands on experience in Hydraulic, Pneumatic, Lubrication equipments. ?          Recomminionsing of 2 MMTPA Pellet plant ?          Successfully achieved 100% of total plant capacity within time limit; consistently maintaining production targets and further working on improving quality and quantity of the product. ?          Maintaining ISO standard and practicing IMS (Integrated Management System) ?          Implementation of SAP under progress. ?          Identifying the various spares and raise indent for the ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
20.00 LPA TO 25.00 LPA
?          Hands on experience in Hydraulic, Pneumatic, Lubrication equipments. ?          Recomminionsing of 2 MMTPA Pellet plant ?          Successfully achieved 100% of total plant capacity within time limit; consistently maintaining production targets and further working on improving quality and quantity of the product. ?          Maintaining ISO standard and practicing IMS (Integrated Management System) ?          Implementation of SAP under progress. ?          Identifying the various spares and raise indent for the ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile