1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 9.00 LPA
Daily monitoring and control of energy consumption of the entire plant.
To ensure compliance with quality standards and maintain related documents.
To ensure the daily routine documentation and utility operation as well as attend the breakdown.
To ensure the Operation of pre-treatment of the water system.
To ensure the effluent treated plant operation, adherence ...
2 Opening(s)
6.0 Year(s) To 10.0 Year(s)
7.00 LPA TO 9.00 LPA
Job Title/Designation: Technical Advisor – Mechanical Service (Power Gas Turbines)
Employment Type: Full Time, Permanent
Job Description:
Selection Criteria – The candidates should have Maintenance experience on Gas Turbine and should have worked on Hot Gas Path Inspections & Major Inspections at customer sites and should have worked in Power Plant industry.
Technical Advisor – MechanicalJob ...
2 Opening(s)
3.0 Year(s) To 6.0 Year(s)
4.00 LPA TO 6.00 LPA
Job Title/Designation:
Field Engineer– Maintenance Mechanical Service (Power Gas Turbines)
Employment Type: Full Time, Permanent
Job Description:
Selection Criteria – The candidates should have Maintenance experience on Gas Turbine and should have worked on Hot Gas Path Inspections & Major Inspections at customer sites and should have worked in Power Plant industry. Also hands experience on ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
We are looking for Electrical HEAD for 8MW Power Plant at Bilaspur location.
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipments / sub system of power ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.80 LPA TO 6.00 LPA
Requirement for Mechanical Head for 8MW power Plant at Bilaspur Location
To get maintenance data for Boiler’s & Turbine areas and evaluation of maintenance performance.
To continuously monitor/measure contract benchmarks, propose required corrective actions to sites.
To maintain centralized data like equipment details, monthly maintenance performance data etc.
To plan required External Services / ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
13.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 25.00 LPA
Business Solar business
1) Job Purpose: Write the purpose for which the job exists
The Solar Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe Solar power plant. This role ensures regulatory compliance and smooth coordination with ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...