1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
12.00 LPA TO 13.00 LPA
Position: Production Manager (Paint Shop)
Location: Zaroli near by Bhilad
Experience: 8 - 10 Years
Industries: Automobile
Responsibilities:
Operations Management
Oversee daily operations of the automotive paint shop.
Plan and schedule painting activities to meet production targets.
Ensure proper surface preparation, painting, and finishing processes.
Monitor paint booth operations, curing ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 6.00 LPA
A Production Manager is a professional who oversees the production process and coordinates all activities to ensure enough resources on hand. They can plan workers' schedules, estimate costs and prepare budgets to ensure workflow meets required deadlines.
A Production Manager is a professional who oversees the production process and coordinates all activities to ...
1 Opening(s)
0 To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
Job Location- Bhosari Pune
JOB DESCRIPTION
Job Description :Job Description:Production Manager (Machine Shop)Experience: Min 10 Years in Heavy Machinery Manufacturing Industry (CNC, VMC, HMC,)Salary budget: up to 10 LPAEducation: BE / BE techProfile Summary:
Optimizing plan performance and meet production/ dispatch targets with quality commitments.
Possess Greenfield project handling experience in Automotive, Aerospace & Heavy Engineering
component ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 6.00 LPA
JOB DESCRIPTION
Production manager8-10 years’ experience in wire harnessing industryLocation: BangaloreApproximate salary: 50000 per monthAccommodation: Shared room provided at no extra cost
The company is managed by experienced and knowledgeable people having many decades of association with cable industry. To match the customer & market needs, all production facilities of latest design ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.60 LPA TO 7.80 LPA
Requirement for PRODUCTION MANAGER - for well reputed plant.at KOLKATA location.
Foundry Process and Inspection in phise plate casting production Checking gating & Method system, Pattern checking with help of drawing before moulding,Moulding sand selection & mould dimension checking and setting the core as per drawing. Pouring Temperature calculations and analysis.Sand quality checking, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.80 LPA
Job description
05.04.24
HPS/2024/202
Production Manager ( Metal & Fabrication Dept)
Male
1
5 to 10
ITI Fitter/DME/BE Mech
The Fabrication Manager position is responsible for supervision and training of fabrication personnel to include the manufacture and quality control of all equipment, parts orders, work orders and equipment process instruction implementation. This position reports to the Plant Manager.
Liaising ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.20 LPA TO 8.40 LPA
A Production Manager in the Steel Melting Shop (SMS) Division oversees daily steelmaking, aiming to meet production targets (quantity, quality, cost) by managing EAF/Induction Furnaces and Continuous Casting Machines (CCM). They optimize raw material charging and refractory life while ensuring high-safety compliance, typically requiring 10-20 years of experience.
Key Responsibilities
Production Management: ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Production Manager: Location: Sachin Factory. Time: 09:30 AM to 07:30 PM. This profile requires candidate with minimum 6-8 years of experience in textile production department. Experience of working in any jari manufacturing unit will be preferred but not mandatory.Should be able to handle production unit individuallycandidate from industry other ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
JD for Manager – Production Department:
He should be Graduate , Mechanical engineer.
Having 10 to 15 years of shop floor experience including machine Assembly / Fabrication / Modern Machine shop & Painting shop of machine building industries .
Must be familiar with Fabrication/ Machine shop/ assembly shop.
Exposure to industrial SAP/ NAV ,software ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 5.00 LPA
Urgent Requirement for AGM/DGM PRODUCTION - INDUCTION FURNACE (EXPERIENCE 10tn, 12TN, 15TN, 20TN furnace) for Reputed Steel plant.
Achieve Daily/Weekly/Monthly production target.Planning of different grades given by PPC Dept.Preparation of charge mix & melting of charge mix in furnaces.Special Grades making, process improvement & Quality improvement.Cost reduction, planning of sequence casting ...