1480 Job openings found

1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 10.00 LPA
Development of New Products from Drawing to Stream Line Production.  Drawing Study & Feasibility study. Design of Process Flow for assembly as well as loose parts. Budget preparation & approval from management for New Projects Project Planning, Machinery & Tools planning for new Project Preparation of PFMEA & Control  Plan Vendor  identification & Enquiry of quotations for Press Tools, Fixtures & Gauges Tool costing & cost finalization with supplier Design, concept discussion & approval for press tool , Fixtures & Gauges Manufacturing schedule & Development plan for  the tools & Fixtures Floor plan layout & material handling plan Operation sheets D.R. documents (PPAP) discussion & submission to the customer (Bajaj Auto Ltd.) Physical tooling status, review & Conduct Trials for press tools, Fixtures & SPMs SIR preparation, correction & approval from Customer Preparation of  Prepilot, Pilot batch & production trial run In house production line layout as per floor plan Mass production  run  Final Process details hand over to the Production Time study & Line Balancing Skill : Press Shop Sheet Metal Product Delevement ,  Job Location : Waluj , Aurangabad For more details call on 9765567699    
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit. Work as per the guideline of TPM/TS Development and mfg. jig and fixture and establishment for production  Decided optimum cycle time for hydraulic and pneumatic testing Co-Ordinate with PPC department for smooth production running Set the robotic line as per the targets and balance the bottle neck operation Overcome all the minor abnormality related to fixture during trial.  Set the TPM target for quality, maintenance, stores and production.  Arrange for all resources including raw materials, man power and facility required. Handling overall press shop production for daily production targets Overall responsibility of welding sub assembly of floor board and running board assembly PROCESS follows with safety and through with safety and work permits.  Achieving the planned targets without Compromising the quality and quantity Working as per various standards like ISO9001&Tsi6949-2002 system Preparation of daily & Monthly reports Co-Coordinating with Stores, QC, QA, Maint .In day to day activity Awareness of seven QC tools to improve quality problems Handling 4M for achieve desired production targets Job Location : Waluj MIDC Aurangabad For more details call on 9765567509
1 Opening(s)
4.5 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Daily production planning and target achieving as per plan. Manpower handling solving customer complaint. Daily model wise production planning. Daily rejection analysis and root cause action report making and preparation of CAPA for any assembly defect. Involve in implementation of kaizen at work station. Familier with  co2 ,spm and robotics welding, seam welding Daily meeting taking ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 6.00 LPA
Role & Responsibility:-   Preventive & Breakdown Maintenance of PLC controlled SPM machine, Grinding Machines, Screw press, Plating  and hardening, tempering ,Nitriding furnaces.machine shop, SMTL Centre less grinding, CNC VMC Lathe Turning/facing, Groove grinding, Wet End, Straightening machines. Tool room tool holder Coordinating the maintenance team for troubleshooting and maintenance of Plant equipments, ensuring least possible downtime for production Planning & executing Planned/Preventive Maintenance activities to improve the machine functionality and prevent machine failure. Planning and implementing maintenance schedules of plant machinery to increase machine up time and equipment reliability. Performing WHY-WHY analysis to get the root cause of failure and implement counter measures to avoid future occurrence. Erection and commissioning of new machinery and providing detailed training to the operators Participating in Process Improvement activities for hazard free operations Executing Kaizen, Poke-Yoke and Continuous Improvement activities Spares management to optimize the availability of spares Supporting the TPM Pillar activities like Planned Maintenance, Focused Improvements & Education and Training Operation & maintenance of air compressors, Chiller pumps DG Set & other utility equipment,
3 Opening(s)
3.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 4.00 LPA
Designation: Tool & Die MakerExperience: 3 to 6 YearsCompany Profile: Since its Inception in 1994, the Group has grown into a multi-location company from single unit, multiple product range from Automobile Ancillary to Home Furnishing. RGI entered in manufacturing in 1994 the group entered in Metal Home Furnishing articles .In financial year 2011-12, ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 4.00 LPA
Designation: Product Costing EngineerExperience: 3 to 6 YearsCompany Profile: Since its Inception in 1994, the Group has grown into a multi-location company from single unit, multiple product range from Automobile Ancillary to Home Furnishing. RGI entered in manufacturing in 1994 the group entered in Metal Home Furnishing articles .In financial year 2011-12, substantial export ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 2.60 LPA
About the responsibilities of the position: The main activity of the production supervisor is that he is responsible for all the shop flower activities as peer following job profile. . Reporting to: Manager Repartees to this position: Production Engineer Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / Production. Or ...
2 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Position: Production (Assembly Line) Senior Engineer (1 No) About the responsibilities of the position: The main activity of the production Senior Engineer is that he is responsible for all the shop flower activities as peer following job profile. . Reporting to: Assistant Manager Educational Qualifications: Bachelor of Engineering in the stream of ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Site Engineers  (A) B.E - Mechanical Engineering. (B) Experienced HVAC Project Engineer. Experience 3 Years and above (C) Roles & Job Responsibility Quantity Take Off & Procurement - Involved in the Quantity Takeoff & Procurement for M.S Pipes, Fittings, etc. for Process Plant and Building Services Reviewing the design/shop drawing Supervising the Erection of G.I Ducting ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.36 LPA TO 3.60 LPA
Job Description Position: Mechanical Engineer / Production Engineer / Maintenance Engineer   22.05.26 134095 HPS/2026/425 Mechanical Engineer Male 2 3 to 5 DME/B.E Mech 9 AM to 6 PM Job Responsibilities: Handle production / maintenance activities in the plant Ensure smooth operation of machines and equipment Monitor machine performance and reduce downtime Troubleshoot mechanical faults and carry out preventive maintenance Maintain production targets and quality standards Coordinate with ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile