78 Job openings found

1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 40.00 LPA
Principal Accountability/ Key ResultGeneration & Revenue - Ensure system availability through effective preventive, breakdown, and predictive maintenance of HV/EHV assets.- Track KPIs, grid conditions, and asset health to minimize downtime and improve MTBF/MTTR.- Drive condition monitoring (thermal, oil, relay, PD/IR) and use diagnostic tools.- Lead RCA, PFMEA, and corrective actions to prevent repeat issues and ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Job Description:  Identify Buyer of Power in Industries for Long term Open Access  Develop Market for Solar 3rd Party Power Plants Communicate with Government and Statutory Stakeholder Create a Database for High Power Consumption Industries Follow up with the customer and Close the Deal Reporting to the Board for progress  Coordinate with Engineering and Sales Teams
4 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 14.00 LPA
Job Purpose:The O&M Site In-Charge will be responsible for managing the day-to-day operations, maintenance, and performance optimization of solar power plants in Karnataka. The role ensures plant availability, reliability, and compliance with safety and quality standards. Key Responsibilities: Operations Management: Oversee daily operations of solar PV plants to ensure optimal performance. Monitor SCADA systems, ...
1 Opening(s)
5.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 11.00 LPA
1. Should be experienced in design and engineering in Solar industry. 2. Should have a individual contributor, proactive, 3. Should have good hold in AutoCad, Google Sktech and PVsyst etc design softwares 4. Smart, Confident, team player" KRA Analysis of Site Survey ReportDetailed Bill of Material Preparation, Costing of solar power plantsElectricity ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.20 LPA
Key Responsibilities: Supervise and coordinate the installation of solar power systems on-site.Ensure all installations comply with industry standards, regulations, and company guidelinesProvide technical support and guidance to installation teams.Troubleshoot and resolve issues related to solar power systems.Conduct regular maintenance checks on installed systems to ensure optimal performance.Inspect and test solar power ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
18.00 LPA TO 20.00 LPA
Unit Solar Power BusinessFunction Quality The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
20.00 LPA TO 20.00 LPA
Essential Duties: 1. Site visit• Site Measurement: Roof detail measurement, cable route marking, termination point marking• Propose all component location to client.2. People co-ordination• Updating daily work to reporting manager3. Detailed Engineering• Detailed site visit report preparation• Understanding the OTM, Scope Matrix and KOM documents for the project• Preparation of shadow ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Unit Solar Power BusinessFunction Quality The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 10.00 LPA
Unit Solar Power BusinessFunction Quality   The Field Quality Manager will be fully responsible to ensure QA in entire construction site during the project execution including material supply quality (at site) & execution quality.On Site FQA representatives will report to FQ Manager for day-to-day Quality compliance & issues captured. He will be responsible for ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile