1 Opening(s)
7.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
In charge of Rolling mill Maintenance & roll shop maintenance, addition to CNC, ASM, controlling KPI
Knowledge of Mill equipment & Mechanical KPI. Knowledge of Reheating Furnace, Rolling stands 2HI, High pressure descaler, and shears, cooling bed, straightener, cutting saw, and stacker & tying machines.
Knowledge of MTTR, MTBF, and Maintenance cost, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
9.00 LPA TO 10.00 LPA
Require immediately for a leading STEEL INDUSTRIES and a highly reputed Group for General manager MECHANICAL for Operation /Sponge Iron Division 350*4 tpd 100*2 at In charge of Operation Department of SID plant at RAIPUR Location ,
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.50 LPA
Hiring for Starch powder, liquid Glucose Manufacturing Industry
Electrical Maintenance Engineer 02
Responsibilities:-
Prepare specifications for process equipment
Prepare Equipment installation drawings and ensure the installation of the equipment as per the same.
Review drawings issued by the vendor.
Complete periodic inspections of the vendor's site to check for the progress of manufacturing of the equipment
Plan and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Requirement GENERAL MANAGER-MECHANICAL MAINTENANCE SPONGE IRON(350*2TPD 100*2TPD) for new generation integrated steel and power manufacturing based in Raipur (chhattisgarh) & Odisha location India. SID-4 Kilns (2 * 350TPD and 100*2tpd)Power- 80 MW/56 MW. (AFBC & WHRB boiler) Induction furnace 12ton-20 Tone (10 Panel) 25 MWT MT TMT Bar mill Ferro Alloys ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 5.30 LPA
Urgent requirement for Manager mechanical maintenance sponge iron dri for reputed steel plant at Bilaspur CG location.
Handling mechanical activities in running maintenance, shutdown maintenance, preventive
maintenance and breakdown maintenance.
Monitoring the root cause of problems arising during routine maintenance work and implementing
systematic solution.
Preparation of preventive maintenance schedule & checklist.
Planning & controlling of ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.50 LPA
Implement all TS & ISO related Documents.
Critical spare part management, Development of local vendor .
All Govt. related activity of Electrical, EHS related paper.
Working on new cost cutting project, Kaizen & implementation.
Maintenance of 3 Axis CNC Pipe bending machine, Assembly line Conveyor
Maintenance of Weld shop containing Nash make Butt welding, Spot ...