1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.50 LPA TO 3.00 LPA
Description:
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.To be familiar with all equipment in plants, maintain all maintenance equipments accurate documents integrity and equipment history database reachable.Knowledge of different types of Flow ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Job Responsibilities
Ensure optimal and continuous operation of mechanical systems by performing routine inspections and maintenance, monitoring metering equipment and adjusting levels as necessary
Maintain systems by scheduling regular inspections, cleanings, filter replacement and all other tasks necessary to keep all components performing optimally; identify and repair or replace malfunctioning components
Ensure safety ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.50 LPA TO 2.00 LPA
Roles & ResponsibilitiesOperate and control JCB equipment to ensure safe and efficient work. Perform routine maintenance checks on equipment to ensure proper functioning. Follow project plans and instructions to complete tasks efficiently. Ensure compliance with safety regulations and company policies.
Roles & ResponsibilitiesOperate and control JCB equipment to ensure safe and ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
JOB DESCRIPTION
Operate and control boiler systems, including coal-fired boilers, biomass boilers, or other types of boilers, to produce steam for electricity generation.
Monitor boiler parameters, such as water level, steam pressure, temperature, and fuel flow, using control systems and instrumentation to maintain optimal operating conditions.
Execute start-up and shutdown procedures for boilers ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.60 LPA TO 4.20 LPA
JOB DESCRIPTION
Operate and control boiler systems, including coal-fired boilers, biomass boilers, or other types of boilers, to produce steam for electricity generation.
Monitor boiler parameters, such as water level, steam pressure, temperature, and fuel flow, using control systems and instrumentation to maintain optimal operating conditions.
Execute start-up and shutdown procedures for boilers ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
JOB DESCRIPTION
Operate and control boiler systems, including coal-fired boilers, biomass boilers, or other types of boilers, to produce steam for electricity generation.
Monitor boiler parameters, such as water level, steam pressure, temperature, and fuel flow, using control systems and instrumentation to maintain optimal operating conditions.
Execute start-up and shutdown procedures for boilers ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.00 LPA
Job Description of 2nd class Boiler Operator:
Responsible for operation of Boiler,Biomass boiler DM/Power Plant .WHRB Boiler including de-aerator operations Steam turbines and steam networksResponsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over after maintenance Issuance of ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 2.50 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...