252 Job openings found

1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.20 LPA
Job Description:  Daily production and dispatch planning on priority basis of press components. Handling permanent & casual manpower. Monitor daily production target as per schedule time with quantity & quality. Parameter setting done after change die as per production plan. Process defect analysis and elimination of same. Conduct daily meeting with Quality Dept &Operater for customer complaint, IHR & necessary actions and accordingly prepare& monitor action ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.20 LPA
    Job Description:  Daily production and dispatch planning on priority basis of press components. Handling permanent & casual manpower. Monitor daily production target as per schedule time with quantity & quality. Parameter setting done after change die as per production plan. Process defect analysis and elimination of same. Conduct daily meeting with Quality Dept &Operater for customer complaint, IHR & necessary actions and ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.40 LPA TO 3.60 LPA
Post : Quality Engineer Experience : Min 2 years in Quality Assurance / TPM Job Profile:          Handles TPM & Quality Documents as per Customer Requirement . Handles Customer Complaints Preparing Presentations of Rejection Analysis and presents it to the management. Conducting IPO & Process  Audits in order to continually refine the process Structure. Preparation of IPO & ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 15.00 LPA
PROFESSIONAL PROFILE: - Management of all activities within the Machine Shop and all other related operations of the company. Plan & schedule all shop activities for timely completion of customer req. Conducting daily production meeting and Co-ordination among various departments for timely completion of production schedules. Conceptualize and implement strict measures in operating procedures and equipments to optimize resource – Man, Machine, Method, Material /Capacity utilization.  Providing strong leadership to the employees at the plants, ensuring high morale, team work and good employee relations at all levels. Working on Process bottlenecks, plan B & plan C to improve the plant performance   Effective implementation of systems are of 5S, TPM-JH,KK,QM,PM, Safety, SOP’s, DMR, SAP, ISO/TS 16949, etc. Actions, analyse & monitor for non conformance by root cause analysis & elimination through ABC analysis, why-why (6W2H), fault tree analysis and various QC tools. Active participation in developing the new components for process selection, process parameters, selection of tool & tooling’s w.r.t. quality & customer requirements. Process & manufacturing cost reduction by analysis & actions on losses, wastages(MUDAS), improvement in Takt time & implementing the concepts of Lean, TPM, Kaizen, Pokayoke, 5S, Single piece flow, Automation, etc. Establish implement and maintain quality system and other documentation required as per ISO/TS 16949. Lead the implementation of new manufacturing initiatives, including strategic resource allocation and applying good manufacturing principles, organization structure, leadership, sourcing and integration, production systems and techniques for improved efficiencies and adherence to best practice. New Product Development /Vendor Up gradation in line of new business development for the Organization. Monitor and improve the results, goal setting & improvements by PQCDSM. Small group activities - instrumental in promotion of small group activities like problem solving, continuous improvement, Mistake proofing, safety, productivity improvement, TPM and circle teams.  Implementing the concepts of “Visual Shop Floor” by 5S, with complete change in “Before & After” conditions by PQCDSM & DMR.   FUNCTIONAL STRENGTHS: -   Production Management & OptimizationStrategic Planning Process up gradation & Cost ReductionTechnical analytic & background Quality Management & System up gradation Production Planning & ControlBottlenecks analysis & Actions to remove      New Product Implementation Gear Cutting – Hobbing, Shaping, Shaving & Machining   MACHINES INCLUDED: -   Hobbing Machines: Conventional & CNC (Liebherr, Mitsubishi, Pfauter, Gleason) Shaping Machines: Conventional & CNC (Internal & External, WS1, Lorenz, etc). Shaving Machines: Conventional & CNC (Sicmat, Hurth, Redring, Nachi, Mitsubishi) ID Honing Machines: Horizontal & Vertical (Nagel) Gear Tooth Chamfering Machines CNC Turning, F & C, VMC, Hard Turning – Mild Steel & Castings Grinding machines: ID and OD Laser Marking machine Gear Testing Instruments  
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit. Work as per the guideline of TPM/TS Development and mfg. jig and fixture and establishment for production  Decided optimum cycle time for hydraulic and pneumatic testing Co-Ordinate with PPC department for smooth production running Set the robotic line as per the targets and balance the bottle neck operation Overcome all the minor abnormality related to fixture during trial.  Set the TPM target for quality, maintenance, stores and production.  Arrange for all resources including raw materials, man power and facility required. Handling overall press shop production for daily production targets Overall responsibility of welding sub assembly of floor board and running board assembly PROCESS follows with safety and through with safety and work permits.  Achieving the planned targets without Compromising the quality and quantity Working as per various standards like ISO9001&Tsi6949-2002 system Preparation of daily & Monthly reports Co-Coordinating with Stores, QC, QA, Maint .In day to day activity Awareness of seven QC tools to improve quality problems Handling 4M for achieve desired production targets Job Location : Waluj MIDC Aurangabad For more details call on 9765567509
2 Opening(s)
6.0 Year(s) To 8.0 Year(s)
7.00 LPA TO 10.00 LPA
PROFESSIONAL PROFILE: - Management of all activities within the Machine Shop and all other related operations of the company. Plan & schedule all shop activities for timely completion of customer req. Conducting daily production meeting and Co-ordination among various departments for timely completion of production schedules. Conceptualize and implement strict measures in operating procedures and equipments to optimize resource – Man, Machine, Method, Material /Capacity utilization.  Providing strong leadership to the employees at the plants, ensuring high morale, team work and good employee relations at all levels. Working on Process bottlenecks, plan B & plan C to improve the plant performance   Effective implementation of systems are of 5S, TPM-JH,KK,QM,PM, Safety, SOP’s, DMR, SAP, ISO/TS 16949, etc. Actions, analyse & monitor for non conformance by root cause analysis & elimination through ABC analysis, why-why (6W2H), fault tree analysis and various QC tools. Active participation in developing the new components for process selection, process parameters, selection of tool & tooling’s w.r.t. quality & customer requirements. Process & manufacturing cost reduction by analysis & actions on losses, wastages(MUDAS), improvement in Takt time & implementing the concepts of Lean, TPM, Kaizen, Pokayoke, 5S, Single piece flow, Automation, etc. Establish implement and maintain quality system and other documentation required as per ISO/TS 16949. Lead the implementation of new manufacturing initiatives, including strategic resource allocation and applying good manufacturing principles, organization structure, leadership, sourcing and integration, production systems and techniques for improved efficiencies and adherence to best practice. New Product Development /Vendor Up gradation in line of new business development for the Organization. Monitor and improve the results, goal setting & improvements by PQCDSM. Small group activities - instrumental in promotion of small group activities like problem solving, continuous improvement, Mistake proofing, safety, productivity improvement, TPM and circle teams.  Implementing the concepts of “Visual Shop Floor” by 5S, with complete change in “Before & After” conditions by PQCDSM & DMR.   FUNCTIONAL STRENGTHS: -   Production Management & OptimizationStrategic Planning Process up gradation & Cost ReductionTechnical analytic & background Quality Management & System up gradation Production Planning & ControlBottlenecks analysis & Actions to remove      New Product Implementation Gear Cutting – Hobbing, Shaping, Shaving & Machining   MACHINES INCLUDED: -   Hobbing Machines: Conventional & CNC (Liebherr, Mitsubishi, Pfauter, Gleason) Shaping Machines: Conventional & CNC (Internal & External, WS1, Lorenz, etc). Shaving Machines: Conventional & CNC (Sicmat, Hurth, Redring, Nachi, Mitsubishi) ID Honing Machines: Horizontal & Vertical (Nagel) Gear Tooth Chamfering Machines CNC Turning, F & C, VMC, Hard Turning – Mild Steel & Castings Grinding machines: ID and OD Laser Marking machine Gear Testing Instruments    
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
7.00 LPA TO 11.00 LPA
Position:        Sr. Executive/Asst. Manager - Production Location:       Dahej - Bharuch Experience:    8 - 12 Years Industries:     Packaging Responsibilities: Production Planning: Develop and implement production plans to meet customer demands while optimizing resources. Analyze production needs, identify areas of improvement, and recommend solutions. Ensure timely release of production orders based on capacity and material ...
3 Opening(s)
10.0 Year(s) To 15.0 Year(s)
5.00 LPA TO 10.00 LPA
S.NO ACTIVITIES RESPONSIBILITIES 1 TESTING Maintain each Lab Instrument operations as per SOP.   Ø    Arrange & check raw materials testing as per received supplier.  Check the RM description on bags/ drums, in case of any doubts.   Ø    Any deviation found, is to be immediately reported to Asst. Manager / Deputy Manager Quality Control.   Ø    Release the Material in system & clear ...
3 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 6.00 LPA
S.NO ACTIVITIES RESPONSIBILITIES 1 TESTING Maintain each Lab Instrument operations as per SOP.   Ø    Arrange & check raw materials testing as per received supplier.  Check the RM description on bags/ drums, in case of any doubts.   Ø    Any deviation found, is to be immediately reported to Asst. Manager / Deputy Manager Quality Control.   Ø    Release the Material in system & clear ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
Handling complete operations of Textile plant from Spinning to Baler including DCS.Experience in continuous process plant or batch process of fibre manufacturing.- Very good understanding of synthetic fibre manufacturing process (Acrylic, Polyester, Nylon, Viscose fibres, etc) - Worked in TPM / TQM culture - Ensuring safe operations of entire Textile ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile