1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 6.00 LPA
*We're Hiring | Production Engineer / Sr. Production Engineer* 🚨
*📍 Location:* Sitarganj, Uttarakhand*💼 Experience:* 3–6 Years*🎓 Qualification:* Diploma / B.Tech (Electrical / Mechanical)*💰 CTC:* ₹5.00 – ₹6.00 LPA (Negotiable)
We are looking for experienced professionals from the *Power Transformer Manufacturing Industry*.
### *Key Requirements:*
✅ Experience in *132kV / 220kV Power Transformer Manufacturing*✅ ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines- EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector
Mandatory areas of Domain Expertise.
Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
10.00 LPA TO 15.00 LPA
Role Summary:
The SCADA Design Engineer is responsible for creating detailed designs, configurations, and documentation for SCADA systems used in industrial automation, power, and renewable energy projects. This includes developing system architecture, network diagrams, and control philosophies; preparing signal lists and cable schedules; selecting appropriate hardware and communication protocols; and configuring ...
3 Opening(s)
8.0 Year(s) To 18.0 Year(s)
Not Disclosed by Recruiter
Position: - Overhead Transmission Line- Gurgaon
Work Mode: 5 Days Work from Office
Exp- 10 -15 Years
Job Specification:
As an ideal candidate for this role, you should have a background in transmission lines EPC company with a minimum of 10 years and having minimum 8 years of design portfolio.
You will be responsible for designing, value engineering, overseeing and managing the transmission line projects efficiently.
Key Responsibilities:
· Design and review 132kV and above large scale overhead Transmission line projects effectively.
· Review ITB document and identification of Risk
· Review Contract document and preparation of clarification
· Review Geographical study report, Environmental Impact Assessment, Power system Analysis report.
· Review/Performing Transmission line planning, Terrain modelling, conductor Sizing, Tower spotting, Sag & tension Calculation using PLS-CADD.
· Review/selection of Hardware & fittings and Grounding system
· Preparation of Bill of material (BOM)
· [Procurement support] Preparation of Design criteria, material requestion (MR) and TBE ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
17.00 LPA TO 30.00 LPA
As an ideal candidate for this role, you should have a background in transmission lines EPC company with a minimum of 10 years and having minimum 8 years of design portfolio. You will be responsible for designing, value engineering, overseeing and managing the transmission line projects efficiently. Key Responsibilities: • ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
25.00 LPA TO 28.00 LPA
Principal Accountability/ Key Result Areas
Supporting Actions (Max 1325 characters for each KRA)
End-to-End System Design & Engineering Review
Lead the design and engineering review for EHV Transmission Lines (up to 400kV), 33kV Wind & Solar EBOP, and Substations.
Validate SLDs, layout drawings, earthing, lightning protection, and auxiliary systems.
Ensure designs are robust, optimized, and aligned with ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
1.Diploma/ ITI in Electrical with 1 years of relevant maintenance experience in substation & similar Utility plant such as Chillers, cooling towers, compressors, HT LT Motors, pumps, etc.. 2.Should have sound knowledge& skill on best maintenance practices, procedures and systems.3.Shall be well versed and experienced with LOTO procedures of HT and ...
1 Opening(s)
18.0 Year(s) To 28.0 Year(s)
Not Disclosed by Recruiter
We have an urgent opening for construction company.
FUNCTION – HEAD ELECTRICAL (INFRA)
Functional area:
ELECTRICAL DESIGN
Role Title :
HEAD : ELECTRICAL (INFRA)
Reports to Role :
MEP Head
PURPOSE
EPC : MEP Design & Build Vertical
KEY ACCOUNTABILITY & RESPONSIBILITY
Experience Min : 18 - 20 Years in Airport, Metro, Hospital, Factories & Building, Ports etc in a ...