1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.
Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.
Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.40 LPA
DCS (Distributed Control System) Operator in an AFBC (Atmospheric Fluidized Bed Combustion) power plant is responsible for monitoring, controlling, and optimizing the boiler and auxiliary systems. Here's a detailed job description:
Key Responsibilities:
Monitor and control the AFBC boiler, including fuel feeding, air flow, and temperature.
Operate the DCS system to maintain optimal ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
DUTIES AND RESPONSIBILITIES
Operates and adjusts high pressure gas, oil, and coal fired boilers in the steam generating plant.
Maintains maximum boiler efficiency by adjusting, reading, and interpreting gauges, indicators, and steam flow meters.
Maintains oil heaters, pumps, oil storage facilities, and oil unloading equipment.
Operates steam plant as situation warrants on natural gas, ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Job Responsibilities
Ensure optimal and continuous operation of mechanical systems by performing routine inspections and maintenance, monitoring metering equipment and adjusting levels as necessary
Maintain systems by scheduling regular inspections, cleanings, filter replacement and all other tasks necessary to keep all components performing optimally; identify and repair or replace malfunctioning components
Ensure safety ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Candidate must have sound knowledge of CFBC Boiler DCS operation with 3 – 4 years of experience for B. Tech Holders or 5 – 8 years for Diploma Holders.
Preference will be given to the candidate having experience of Thermax make IRCFBC Boiler.
Urgent requirement of Boiler DCS Engineer/Operator for 2*35 MW ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Job Description:
General Manager (Power Plant) MECHANICAL - BROWN FIELD PROJECT
60 MW POWER PLANT , 250 TON AFBC BOILER
The general manager will be responsible for overseeing the efficient and effective operation of a power plant. Reporting to the Managing Director, the General Manager will lead a team of professionals and ensure compliance ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Requirement GENERAL MANAGER-MECHANICAL MAINTENANCE SPONGE IRON(350*2TPD 100*2TPD) for new generation integrated steel and power manufacturing based in Raipur (chhattisgarh) & Odisha location India. SID-4 Kilns (2 * 350TPD and 100*2tpd)Power- 80 MW/56 MW. (AFBC & WHRB boiler) Induction furnace 12ton-20 Tone (10 Panel) 25 MWT MT TMT Bar mill Ferro Alloys ...
1 Opening(s)
2.0 Year(s) To 15.0 Year(s)
2.40 LPA TO 15.00 LPA
Urgent Requirement for AGM/GM for power plant afbc cfbc boiler at Raipur location
To get maintenance data for Boiler’s & Turbine areas and evaluation of maintenance performance.
To continuously monitor/measure contract benchmarks, propose required corrective actions to sites.
To maintain centralized data like equipment details, monthly maintenance performance data etc.
To plan required External ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 16.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...