34 Job openings found

1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.16 LPA TO 3.00 LPA
A DCS Engineer for Boiler/Turbine is responsible for operating and optimizing power plant equipment using a Distributed Control System (DCS). Key duties include monitoring and controlling boiler and turbine operations through the DCS, ensuring safe and efficient performance by adjusting parameters like pressure and temperature, and executing start-up and shutdown procedures. The role ...
1 Opening(s)
20.0 Year(s) To 24.0 Year(s)
20.00 LPA TO 25.00 LPA
Job Title: General Manager – 35 MW Power Plant (WHRB) Location: Raigarh, Chhattisgarh Industry: Power / Energy / Steel Reporting To: Director / Managing Director Job Overview: We are seeking a highly experienced and result-oriented professional to lead operations of a 35 MW Waste Heat Recovery Boiler (WHRB) based Power Plant. The General ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
 Job Description: General Manager (Power Plant) MECHANICAL - BROWN FIELD PROJECT 60 MW POWER PLANT , 250 TON AFBC BOILER    The general manager will be responsible for overseeing the efficient and effective operation of a power plant. Reporting to the Managing Director, the General Manager will lead a team of professionals and ensure compliance ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Key Responsibilities Boiler Operations: Independently operate and monitor high-pressure IBR (Indian Boiler Regulations) steam boilers (e.g., AFBC, oil/gas-fired, WHRB) as per the Standard Operating Procedures (SOPs). Manage boiler start-up, shutdown, and emergency procedures safely and efficiently. Maintain desired steam pressure, temperature, and flow rates to support continuous chemical plant operations. Conduct regular rounds of the ...
8 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.   Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.   Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.   Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Requirement GENERAL MANAGER-MECHANICAL MAINTENANCE SPONGE IRON(350*2TPD 100*2TPD)  for new generation integrated steel and power manufacturing based in Raipur (chhattisgarh) & Odisha location India. SID-4 Kilns (2 * 350TPD and 100*2tpd)Power- 80 MW/56 MW. (AFBC & WHRB boiler) Induction furnace 12ton-20 Tone (10 Panel)  25 MWT MT TMT Bar mill Ferro Alloys ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile