1 Opening(s)
0 To 5.0 Year(s)
1.00 LPA TO 8.00 LPA
3 to 6 years experience in digitization and detail engineering of Steel plant or Oil and Gas or Pharmaceutical or Gas power plant.This requirement is on three different tools.1) Autodesk Plant 3D (P3D)2.) Revit Structures3.) InventorAuto desk Plant 3D:
Existing Working experience on Plant 3D. Minimum 3 years
Knowledge on P&ID
Knowledge on Piping ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 4.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 8.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 4.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Implementing system of Quality System Basic and work to sustain the system by conducting periodic checks on the Production and find solutions to the problems which may arise to ensure product quality.
Also having experience in Welding and Painting Inspection and having Knowledge of ISO9001 and ISO14001.
Reviewing and checking of welding ...