5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapor Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility manager.
1. ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.50 LPA
Qualification: DME / BE Mechanical, ProductionExperience: 3 to 8 years experience in AutoCAD & Solid works designing for Cooling tower / Structural fabrication /HVAC industry.Work location: Swargate in Pune
Job profile:Hand on experience with back ground knowledge of few design codes like ASME, IS, all International Codes & Standards.Computer Skills in AutoCAD & Solid ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapor Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility manager.
1. ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.
Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
1 Opening(s)
0 To 4.0 Year(s)
1.00 LPA TO 8.00 LPA
Structural & sheet metal fabrication with erection- supporting structure, column-beams, conveyer, truss,
plate-rolling(ducts), chutes, cyclone, hopper, compressors etc. Machinery and equipment erection.All piping(SS, MS)fabrication and erection for the plant.All tanks (SS, MS) fabrication and erection for the plant.Motors and pumps installation for the plant.Maintenance of Motor & bearing lubrication, shaft, coupling, ...
1 Opening(s)
0 To 1.0 Year(s)
2.00 LPA TO 4.00 LPA
tructural & sheet metal fabrication with erection- supporting structure, column-beams, conveyer, truss,
plate-rolling(ducts), chutes, cyclone, hopper, compressors etc. Machinery and equipment erection.All piping(SS, MS)fabrication and erection for the plant.All tanks (SS, MS) fabrication and erection for the plant.Motors and pumps installation for the plant.Maintenance of Motor & bearing lubrication, shaft, coupling, ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
0.00 LPA TO 0.00 LPA
We are having an urgent requirement for the position of Factory Manager for a reputed Manufacturing company at the West Bengal(Haldia) location.
Qualification: BE (Chemical); Preferably with MBA.
Experience: About 15- 20 Years in which at least 4-5 years must be as plant head of any sulphuric acid plant. Knowledge of the manufacture of ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Urgent Requirement of Mechinical Engineer for Reputed firm at Raipur
Urgent Requirement of Mechinical Engineer for Reputed firm at Raipur
Urgent Requirement of Mechinical Engineer for Reputed firm at Raipur
Urgent Requirement of Mechinical Engineer for Reputed firm at Raipur
Urgent Requirement of Mechinical Engineer for Reputed firm at Raipur
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 0.00 LPA
We are having an urgent opening for the position of Structural Design Engineer for a reputed Company at the Mumbai location.
Key Responsibility:
Experience Industrial Civil & Structural Engineering.
Structural Analysis and Design Skills.
Design of Steel & RCC Structures as per ACI, BSEN, AISC ASD/LRFD & Indian Codes
Connections as per AISC ASD/LRFD & Indian ...
2 Opening(s)
5.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 10.00 LPA
Operation & Maintenance of ETP/ WWTP plant.
ï?? Problem short out in ETP/WWTP Plant.
ï?? GE Water & Process Technology totally auto in PLC/SCADA System Operating.
ï?? Maintenance Cleaning & Recovery Cleaning of UF.
ï?? Chemical Cleaning in GE RO System.
ï?? Activity of GAC Vessel in Carbon Sanitization & Backwash.
ï?? 19 M³ Ro plant of Four Noâ??s GE Water & Process Technology
ï?? Regularly fill-up, the history of all WWTP equipmentâ??s as per ...