1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 2.40 LPA
Hiring for the post of Quality Engineer / Executive for Corrugated box Manufacturing Industry
Post: Quality Engineer / Executive
Education: Any Graduate
Experience: Min 2 Years
Salary: up to 2.40 LPA
JD:
To kay member of gain BAL TPM award work as TPM Coordinator.
To Kay Member of gain IMS system & Dwm System for improving Plant system.
Handle internal & External Quality issue resolve it. take action on it.
Make an IPO reduce internal rejection. Define all Quality Team Role & responsibility.
Every Day rejection analysis and their corrective action with production dept
Troubleshooting problem with equipment, device or products. l Quality Documentation of ISO 9001 &14001 & 18001.
Making IPO and its linking with all system
Working IN corrugated Packaging company check IQC LQC & OQC Process & Quality Parameter
IQC:- Check Paper, Inks, Stitching Wire & Gum & maintain Supplier LRR
LQC:-Check FPA, Daily Rejection, Time Check, Rejection Analysis(Fill up Red Book) conducted Daily Meeting & Management of internal NCR
OQC: -Sampling Plan as per military Standard 105 D & maintain customer Internal LRR
New Product Development and their Documentation Such as FPA.
Doing Calibration of Assembly Process equipment.
Working team member in six Sigma Project. Flow Chart, Fishbone diagram& CAPA
Handle customer complaint and solve. Their Problem such NCR report & 8D report. Demonstrated strength in oral and written communications.
To maintain customer return records.
Check incoming nonconformance & Supplier Action Plan.
Monitoring supplier LRR (LOT REJECTION RATE) and NCR Management
Job Location: Waluj MIDC, Aurangabad MH
If you are interested kindly send your updated CV / Resume on career@paradiseplacement.co.in
for more ...
2 Opening(s)
1.0 Year(s) To 4.0 Year(s)
1.20 LPA TO 2.40 LPA
Office coordination
* Coordination.
* Back office coordination.
* Office assistance
* Excellent in Advanced Excel(Pivot, VLOOKUP, HLOOKUP)
* Good communication Skills.
Responsible for preparing & maintaining of Daily, Weekly, Monthly MIS & various other MIS
Knowledge of Excel (shortcuts, autofilter, sorting, Vlookup, Pivot table)
MS Excel, Advanced Excel
Location: Thane west
Salary: Upto 180000LPA
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 4.50 LPA
Position: Senior Engineer Production
About the responsibilities of the position: The main activity of the production supervisor is that he is responsible for all the shop flower activities as peer following job profile. .
Reporting to: Manager
Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / Production. Or Diploma in Engineering in ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 8.00 LPA
Hiring for QMS / MR/ TPM Manager
Experience: Min 6 Years in Experience in operating the quality management system & Integrated Management System (EMS & OHSAS), TPM, Kaizen, Writing procedures and processes to support the QMS development, internal auditing, and QMS documentation.
Salary budget: up to 8.00 LPA
Key Responsibilities :
Preparation and maintenance of the company for IMS (ISO 9001:2015 OHSAS 18001:2007, & ISO ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic / Electrical / Mechanical
Gender: Male
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as an associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase, Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Shendra MIDC, Aurangabad
for more details call on 7249840222 / 9765567505
1 Opening(s)
7.0 Year(s) To 20.0 Year(s)
4.50 LPA TO 5.00 LPA
Hiring for QMS / MR/ TPM Manager
Experience: Min 7 Years in Experience in operating the quality management system & Integrated Management System (EMS & OHSAS), TPM, Kaizen, Writing procedures and processes to support the QMS development, internal auditing, and QMS documentation.
Salary budget: up to 5.00 LPA
Key Responsibilities :
Preparation and maintenance of the company for IMS (ISO 9001:2015 OHSAS 18001:2007, & ISO ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic
Gender: Female
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase , Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Chitegaon MIDC , Aurangabad
for more details call on 7249840222
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.20 LPA
Job Description:
Daily production and dispatch planning on priority basis of press components.
Handling permanent & casual manpower.
Monitor daily production target as per schedule time with quantity & quality.
Parameter setting done after change die as per production plan.
Process defect analysis and elimination of same.
Conduct daily meeting with Quality Dept &Operater for customer complaint, IHR & necessary actions and accordingly
prepare& monitor action ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.20 LPA
Job Description:
Daily production and dispatch planning on priority basis of press components.
Handling permanent & casual manpower.
Monitor daily production target as per schedule time with quantity & quality.
Parameter setting done after change die as per production plan.
Process defect analysis and elimination of same.
Conduct daily meeting with Quality Dept &Operater for customer complaint, IHR & necessary actions and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.50 LPA TO 4.25 LPA
Qualification: Diploma / BE in Mechanical or Production with 2 to 5 yrs experience in Heavy fabrication & machining project handling activities like Conveyor, Material handling / Industrial processing equipment, Dust collector, SPM Machines.
Job description:Experience in heavy fabrication & machining, manpower handling. Heavy Fabrication process knowledge.Coordinate with internal department like ...