1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
OB RESPONSIBILITIES:
1) Estimation & Costing engineer for manufacture of storage tanks (CS & SS), reactor, Heat Exchanger, column etc.
2) Manufacturing code knowledge viz, API 650, IS 803, ASME SEC VIII, sec II, sec IX etc. is essential.
3) Costing detail in Excel to be recorded with direct cost margin & sale value ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Location :- Maval
Experience In Fabrication Industries
Should have sound knowledge in any one of above mentioned manufacturing processes
Good CAD Skills Conversant with PDM Hands-on with Creo
Awareness of IATF 16949:2016 specs and development of products accordingly
GD&T Knowledge Mandatory
Conceptualization to Industrialization - Complete Product Life Cycle development experience for at least two products
Tooling (Press fit, ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
8.00 LPA TO 15.00 LPA
EPC cost Estimation of Heavy Civil Infra (Highways, Bridges, Airports, Metro –elevated & underground TBM Tunnel)
Reviewing Contractual Clauses and assessing risk at bidding stage and options of mitigating the same
Rich knowledge in Rate Analysis, Direct-Costs, Indirect- Costs, Cash flow and Cost flow Pre- Contracts/ Post- contracts for underground & elevated metro rail, roads
Manage complete Construction Project Management activities including preparation of resource allocation ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
Responsible for managing & designing of all types of HT Power, LT Power, Control, Instrumentation & Special types of cables.
Provided technical assistance to customer and resolve any issue in design.
Resolving technical queries of products to achieve customer requirements.
Providing technical support to Sales and marketing department.
Analysed design documents and checked its ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
6.00 LPA TO 7.00 LPA
Responsible for reviewing the drawings and specifications of the projects prepared by the design team, and accordingly creating the final detail or Bill of Quantities (BoQ). Obtain – in coordination with Procurement Department – material and construction prices for cost estimation, develop and maintain necessary systems to ensure delivery of ...