2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.16 LPA TO 3.00 LPA
31.01.26
125396
HPS/2026/78
Technician/Electrician
Male
2
2 to 3
ITI Electrician
10 Hrs + Bus
An Electrical Technician installs, maintains, and repairs electrical systems, wiring, and equipment, reading blueprints, diagnosing faults with testing devices, and ensuring safety compliance with codes.
Key Responsibilities:
Installation & Assembly:
Install, assemble, and test electrical wiring, control systems, lighting, and machinery.
Maintenance & Repair:
Perform routine maintenance, inspect components (transformers, ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
2 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 3.00 LPA
Core responsibilities
Installation:
Install electrical components like wiring, circuits, outlets, and control systems in new and existing structures.
Maintenance and Repair:
Perform routine maintenance, troubleshoot electrical problems, and repair or replace faulty components and equipment.
System Oversight:
Inspect electrical systems, power sources, and equipment to ensure they are up to code and operating correctly.
Technical Interpretation:
Read and ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
4.80 LPA TO 6.00 LPA
An operator for SID (Sponge Iron Division) Mechanical would be responsible for operating heavy machinery, specifically a remote-controlled demolition robot like those manufactured by Brokk. The operator would work within the mechanical maintenance and operations division of a steel or sponge iron plant.
Key duties and responsibilities
Machine operation: Safely and efficiently operate ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.00 LPA
1 To follow all safety rules and standards. Participate in safety tool box talk.Ensure compliance of SOP, work permit systems and environment care2 To ensure the use of job specific tools in good condition and tested 3 To do 5s activities in work place . 4 To attend class room ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
3.60 LPA TO 5.00 LPA
We Are Hiring Assistant Project Manager (MEP) In Mumbai.
Job Title: Assistant Project Manager – MEP
Location: Thane Mumbai Department: Project Execution / Engineering Reports To: Project Manager – MEP / Senior Project Manager Type: Full-Time / Site-Based
Key Responsibilities:
Assist in planning, scheduling, and monitoring all MEP activities at the project site.
Coordinate with ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
12.00 LPA TO 20.00 LPA
Position: Auto Electrician – All Vehicles
Location: DURG, BHILAI Experience: 5–7 Years Salary: Best as per last drawn salary / Negotiable Age: 30–40 Years
Key Responsibilities:
Install, maintain, and repair electrical wiring and electronic systems in all types of vehicles (commercial and light-duty).
Diagnose issues in lighting, ignition, battery, alternator, starter, sensors, and wiring harnesses.
Use ...