1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
6.00 LPA TO 8.00 LPA
We have an opening for the post of Utility and Piping Executive for a reputed Eng. industry for their Thane (Wagle Estate) locationJob description:
Draft detailed layouts of utility piping systems using CAD software.
Ensure design compliance with relevant standards and regulations.
Collaborate with engineers and project teams to optimize system layouts.
Prepare material lists and specifications.
Assist ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
LinkedIn Page: https://www.linkedin.com/company/eseskay-projects
Position-: Mechanical/Process Engineer
Location-Akota, Vadodara
Experience-: 3 to 7 Yrs.
Interview mode-: Online/Face to Face
Roles and Responsibilities-:
To prepare Mechanical Data sheets of equipment used in ETP / STP
To Prepare Technical Bid Analysis.
Preparation and review of, layouts, equipment list, PID, piping drawings, Valve MTO, piping MTO, mechanical data sheets for equipment, and process data ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Company Name: Eseskay Projects LLPCompany Profile: Large projects in the field of infrastructure and environmental management and in the design and execution of water and wastewater treatment plants for municipalities, industrial estates, and industrial and sewage wastewater including treatment and recycle.
Company Website: http://www.eseskayprojects.com
LinkedIn Page: https://www.linkedin.com/company/eseskay-projects
...
3 Opening(s)
1.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 10.00 LPA
DCS testing and functional test.
Instrumentation loop test.
Filling log sheets during commissioning and startup.
Manage the alarms carefully and report it for any abnormality
Carry out dynamic functional test as per the test plan for assigned system.
Following LAB sampling result and take necessary corrective action if need.
Safe and successful plant startup and shutdown.
Assist ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
7.20 LPA TO 9.00 LPA
Key Responsibilities• Preparation of HT & LT, transformer yards, bus duct layout, electrical room, rising main layout, DBmounting and section details.• Main single line diagram, lighting and raw power layouts, lightning protection layout, UPS & rawpower distribution layouts.• Preparation of fire alarm, access control, closed-circuit television, and public addressingsystem schematic ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
5.00 LPA TO 6.00 LPA
Key Roles and Responsibilities
In the pharmaceutical industry, a Project Engineer's main responsibilities involve ensuring the technical work is completed safely, on time, within budget, and in compliance with stringent regulatory standards (like cGMP).
Project Planning & Execution
Prepare & review project schedule, P&ID, and GA Drawing.
Co-ordinate with cross functional teams. (Civil, ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Sr. No.
Details
1
To Execute and monitor brown field projects, Capex jobs, modification job, process improvement jobs by understanding process.
2
Plant Layout set up by understanding operational requirement with project manager
3
Equipment’s detailing, Erection and commissioning of GLR, SSR, Tanks, Pumps, Heat Exchangers, Vessels, Columns, Blowers ANF, Dryer, etc along with schedule bar chart
4
Reading ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
3.00 LPA TO 4.20 LPA
A pipe fabricator's job description involves cutting, shaping, bending, and welding pipes and fittings according to blueprints and technical drawings to create functional piping systems. Key duties include assembling systems for industries like oil and gas or construction, inspecting work for quality and safety compliance, and performing repairs. This role requires proficiency with ...
1 Opening(s)
2.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.50 LPA
Job Description:
Developing designs from scratch.
Ensuring product designs meet required safety and structural standards.
Generating 2-d models using AutoCAD software(PFD ,Layout ,GA ,Piping Isometric ,PID )
Blending technique and aesthetics to create final designs.
Presenting various design perspectives for improvements and adaptations.
Finalizing AutoCAD models.
Presenting models to clients for approval
Completing job reports.
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
Description:
We have an opening for the post of Piping Draughtsman for a reputed Eng. industry for their Thane (Wagle Estate) location.
Key Responsibilities:
Familiar in making Plot Layouts with pipe rack routings.
Expert in Piping Layout & Routing.
Experience of making Piping Isometrics for pharmaceutical plant.
Expert in Equipment Placing & Layout for pharmaceutical and API Plants.
Shall be able ...