3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Location of Role Jhagadia, Bharuch, Gujrat Role, job contents, scope, responsibilities He has work experience of different Field instruments (e.g. low meters, Transmitters, control valves and Anaylzers) He also should work on different types of sensors and doing panel wiring Likely position/Title ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.80 LPA TO 2.40 LPA
He must have good knowledge about maintaining Swimming pool, ETP,STP andits accessories.? Individually must have quick response to tackle and correct the faults on callbacksor on service.? Electrical and electronics components knowledge is a must.? Responsible for the control panel testing and commissioning.? Responsible for electrical power supply machineries.? Following ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 4.00 LPA
The person should be able to work effectively across Multiple Projects in a fast-paced manner.
Exp in Project detailing, planning, engineering, coordinating and scheduling with facility and
equipment layouts, Modular Clean Room Panel, Piping, MTOs and layouts.
Responsible for installation & Commissioning for automation
projects (Mitsubishi, Siemens, and Rockwell).
Onsite Inspection & Commissioning & handling ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Main Responsibilities? Executing the tendering process from vendor /contractor evaluation, floating bids, bidevaluation, techno-commercial meeting, negotiation, Preparing & awarding the Order orContract.? Complete procurement to pay Cycle for Following category of items / ServicesA. Engineering Purchase – Machine spares, PPRC pipe fitting, RO Spares Pumps & Furnitureetc.B. Electrical Purchase – ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
12.00 LPA TO 14.00 LPA
Applicants should have exposure/competence in the following:? Detailed experience & knowledge in various aspect of elevators &escalators; including :1 – Commissioning of elevator & escalator,2 - Mechanical Installation,3 - Electrical Wiring, reading wiring diagram,4 – Trouble shooting & repairing? Need to know about making & setting templates at start ofinstallation.? ...
2 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.20 LPA TO 3.00 LPA
Job Description
• Installation and Commissioning of Online Check Weigher (Dynamic), Online Shipper
Weigher, labelling machine, packing robot like case erector.
• Knowledge about secondary packaging line machine like visual inspection
machine, printing machine, printer like Domino, vidojet, Markem image ,Hitachi ,etc.
• Drive parameter setting, Testing of PLC based machine, check PLC logics according
to ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
he person should be able to work effectively across Multiple Projects in a fast-paced manner.
Exp in Project detailing, planning, engineering, coordinating and scheduling with facility and
equipment layouts, Modular Clean Room Panel, Piping, MTOs and layouts.
Responsible for installation & Commissioning for automation projects (Mitsubishi, Siemens, and Rockwell).
Onsite Inspection & Commissioning & ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Company Vardhman Group Unit / Division Vardhman Acrylics Limited Location of Role Jhagadia, Bharuch, Gujrat Role, job contents, scope, responsibilities He has work experience of different Field instruments (e.g. low meters, Transmitters, control valves and Anaylzers) He also should work on different types of sensors and doing panel ...
1 Opening(s)
0.6 Year(s) To 6.0 Year(s)
1.00 LPA TO 3.00 LPA
Candidates should have installation or maintenance experience with textile spinning machines.
Electrical Maintenance of spinning machines.
Travelling is mandatory.
Knowledge in Electrical Panel Maintenance.
Have to Sign 3.6 yrs of agreement with company.
Knowledge about Spinning Machines
Aggregate should be 60%.
Candidate should have good communication in English.
Qualification - B.E. /Diploma (Electrical / Electronics / ECE)
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 4.00 LPA
The person should be able to work effectively across Multiple Projects in a fast-paced manner.
Exp in Project detailing, planning, engineering, coordinating and scheduling with facility and
equipment layouts, Modular Clean Room Panel, Piping, MTOs and layouts.
Responsible for installation & Commissioning for automation
projects (Mitsubishi, Siemens, and Rockwell).
Onsite Inspection & Commissioning & handling ...