2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.50 LPA
We are seeking a skilled Production Engineer with hands-on experience in EBM (Extrusion Blow Moulding) and IBM (Injection Blow Moulding) processes. The candidate will be responsible for ensuring smooth production operations, maintaining quality standards, and optimizing machine performance.
Key Responsibilities:
Operate and monitor EBM & IBM machines
Ensure daily production targets are achieved
Maintain ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
A Quality Engineer (QE) requires a bachelor's degree in engineering (Mechanical, Electrical, Industrial) or a related field, typically with 2–5 years of manufacturing experience, focusing on ISO standards, Six Sigma, and root cause analysis. Key qualifications include proficiency in statistical process control (SPC), data analysis tools (Minitab), and certifications like ASQ-CQE ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
A Helper Mechanical for a Coal Washery assists skilled mechanics in the maintenance, repair, and installation of the plant's mechanical systems and machinery. This entry-level role is crucial for ensuring the smooth and safe operation of the coal washing process.
Key Responsibilities
Assist Mechanics: Work alongside experienced mechanics to repair and maintain a variety of ...
2 Opening(s)
7.0 Year(s) To 8.0 Year(s)
4.80 LPA TO 6.00 LPA
12.02.26
126286
HPS/2026/126
Production Engineer
Male
2
7 to 8
DME/B.E-Mech
9 to 7 & Only Day Shift
Job Title – Production EngineerNo of openings – 2 NosJob Location (City & Location) – SuratSalary – (40 To 50 K)Minimum Qualification - Diploma MechanicalCandidate Experience Needed Minimum Experience – 7 To 8 YearsGender Preference – Male Job Info / Job Description – Production ...
10 Opening(s)
4.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 4.20 LPA
12.02.26
126281
HPS/2026/124
Tool Die Maker
Male
10
4 to 7
ITI Tool & Die Maker
9 to 7 & Day+Night
A Tool & Die Maker designs, constructs, repairs, and maintains high-precision tools, dies, jigs, fixtures, and molds used in manufacturing processes
Key Responsibilities-
Production & Fabrication: Read/interpret technical blueprints, CAD files, and sketches to create, assemble, and test tools, dies, and gauges.
Machining ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
9.60 LPA TO 18.00 LPA
A Steel Manufacturing Melter operates furnaces to melt raw materials (scrap, alloys) into molten steel, controlling temperature, composition, and quality, while managing slag, tapping metal into ladles, and strictly following safety/maintenance procedures for efficient, high-quality production. Key duties involve furnace charging, temperature/chemical adjustments, sampling, refining, and coordination with the production team ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Reports to: Vice President-Operations
Location: Khandala (Satara)
Address: Parekhplast India Limited
Taluka :- Khandala,
District:- Satara, PIN:- 412 802 ,Maharashtra.
Job Purpose
To ensure that the product is manufactured and delivered effectively, efficiently, on-time, to specifications and in a cost effective manner and to oversee maintenance function and ...
1 Opening(s)
0.6 Year(s) To 1.0 Year(s)
1.20 LPA TO 1.44 LPA
The job of a Foundry Plant Maintenance Helper is an entry-level support role that involves assisting skilled technicians with the installation, maintenance, and repair of machinery and equipment in a foundry environment. This role serves as a foundational step for individuals aspiring to become full-fledged maintenance technicians or engineers.
Key Responsibilities
Assist with Maintenance and ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.32 LPA TO 1.44 LPA
A Welder in refractory product manufacturing is responsible for fabricating and repairing metal components (molds, forms, frames, and machinery) used to create heat-resistant refractory products, working from technical documents and adhering to strict safety and quality standards.
Key Responsibilities
Interpret technical documents: Read and understand blueprints, engineering drawings, and specifications to plan layouts and ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 22.00 LPA
A Head Sinter Plant Project Job Description involves leading operations, maintenance, quality, and safety for the sinter plant, focusing on producing high-quality sinter for blast furnaces through process optimization, team management (engineers, operators), budget control, and adherence to safety/environmental standards, requiring extensive experience in heavy industry processes like sintering, blast furnace ...