1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
ELECTRICAL ENGINEER-EAF/LRF/CCM
Maintenance of all types of Electrical work
35 ton Electric Arc & Ladle Refining Furnace.
110T, 75/20, 35/10 Crane maintenance.
LT circuit breakers like ACB, MCCB and MCB.
HT circuit breakers like VCB ,SF 6 .
Motor starter like Star-Delta, DOL, Forward –Reverse.
MCC Panel and Power Distribution Boards.
DEEMAG make continuous casting machine having radius 12.5/21.
Automatic ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
? Identify manufacturing needs for new products in development
? Design new systems and processes and provide facilities & methods to ensure the cost effective integration of new products or for the improvement of existing ones into manufacturing operations
? Ensure all product and system requirements are taken into account from the ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.25 LPA TO 3.50 LPA
The candidate should have :
Knowledge of Cold Roll Forming Mill, Press Operation, Manpower Handling , ERP Entry .
Process knowledge of rolling mill, ,Tube Mills, Sheet metal works, welding, fabrication, ERP Operating, Lean Manufacturing system, 5S, & Kaizen etc.
Knowledge of Basic Operation of Production and ERP Operating and Manpower Mngt
Responsibilities:
Supervising the ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.00 LPA
Evaluates manufacturing processes by designing and conducting research programs; applying knowledge of product design, fabrication, assembly, tooling, and materials; conferring with equipment vendors; soliciting observations from operators.
Develops manufacturing processes by studying product requirements; researching, designing, modifying, and testing manufacturing methods and equipment; conferring with equipment vendors.
Improves manufacturing efficiency by analyzing ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.50 LPA TO 3.50 LPA
Important Keywords :
Rolling Mills , Tube Mills, Press Maintenance , EOT Cranes & PLC
Knowledge of PLC, AC/DC motors, Power Transformer , Circuit Breaker, HM-Serve Motor, DC Panel, APFC Panel, Rolling Mills , Tube Mills, Press Maintenance & EOT Cranes etc.
Candidates must have experience in Manufacturing units equipped with Rolling Mills ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 4.75 LPA
Mechanical Maintenance Sr. Engineer.
By implication they look after the plant and equipment mechanical performance.
They need a thorough knowledge of the sciences and mathematics in their discipline.
When it comes to problem solving they will need to venture beyond the mechanical discipline and look at a wider range of factors (other than ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
2 Opening(s)
0 To 2.0 Year(s)
1.68 LPA TO 1.68 LPA
To take care of routine Electrical maintenance activities
Upkeep of equipments, ensuring 100 % availability for maintenanc
Prepare preventive maintenance schedules for major / critical equipments.
Inventory control and monitor spares availability
Analysing failure and reporting
Coordinate during shutdown maintenance and reporting
Down time analysis
Carry out all activities related to the purchase of equipment designed by a ...
2 Opening(s)
0 To 1.0 Year(s)
5.00 LPA TO 5.00 LPA
Basic knowledge of all machine available in the plant.
Knowledge of capacity calculation of Machines.
Knowledge of Basic operation process.
Knowledge of time study, work study, Line balancing & process lay out development.
Calculation of Manpower as per process stations.
Should be dynamic to learn and grow
Should be comfortable enough to work ...
5 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.60 LPA
We are looking for an active Project Coordination and Estimation Engineer . The primary responsibility of the candidate will need to Design technical offer based on client requirement, Quotation Submission within deadline, Inquiry follow up.
Freshers can apply too
Must have excellent communication skill (English/ Hindi/ Gujarati).
Ability to manage all inquiries and generated ...