2 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.40 LPA TO 2.40 LPA
Must have Good knowledge in operating molding machines.- Have to handle production activities and mold trials and setting.- Have to handle material stocks.
-Machine details 650 T (JSW)m 90 MM Screw,Shot Weight 3190
-Machine Details 450 T (Kaptiva 900 MM Screw, Shot Weight 1800
Sets machine controls, regulating molding temperature, volume of plastic, ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
Schedule and undertake periodic maintenance on all electrical equipment, components, and installations Like Compressor,Chilling Plant,Cooling Tower.Injection Molding and Composer Molding Machine
Provide prompt response to inquiries whenever there is a breakdown, and resolve the issue as quickly as possible to maintain all utility equipment.
Ensure that equipments are in good working order ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.20 LPA
Designation : Machine Maintenance Engineer
Experience: 2 to 3 years in Plastic injection Molding Setup.
Salary Range : 1.8-2.2 LPA
Required Qualification - BE or Equivalent.
Job Desciption:
Maintenance of injection molding machine & SPM machine
Execution of PM & PDM as per schedule, Analysis of breakdowns
Execution of TPM &PM pillar Activities
Energy saving project
Attending major breakdown maintenance
Handling documentation of executive & planned maintenance
Execution of TBM CBM as per schedule
Study of detoriotive components
Applications of kaizen
Troubleshooting and attending breakdown maintenance
Housekeeping maintenance related to department modification and spare management
Implementing ISO/TS16949, 5’s and FORMELQ
To improve machine uptime (MTBF)
To improve machine repairs time (MTTR)
Maintained machine history card
To handle electrical supply system I.e.HT &Lt side
Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive
Keeping spare in ready operational condition and maintenance of utility equipment
Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c
Presentation of monthly PRM
Taking outside service appointment & spare management
Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial
Documents against invoice
Working on welding machine, grinding machine, injection model and plastic mold
Job Location : Waluj MIDC, Aurangabad
For more details call on 9765567509
1 Opening(s)
8.0 Year(s) To 14.0 Year(s)
6.00 LPA TO 7.00 LPA
Maintenance Activities
As a Maintenance Executive (HOD) representative to Plant head (GM)
Maintenance of Plastic injection molding press ,assembly machines, utility machines,tool room machines
Responsible for breakdown targets ,PM planning and execution.
Spare part planning with critical spare and inventory control .
Preparation of maintenance budget with annual shutdown plan budget.
Monitor and control utility operation and its maintenance and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
4.20 LPA TO 5.20 LPA
Job Summary:
The Quality Control Executive is responsible for inspecting, testing, and ensuring that all electrical switch and socket products meet defined quality standards and customer specifications. This role involves supervising in-process and final product checks, maintaining documentation, and ensuring compliance with BIS/ISI standards and internal quality protocols.
Key Responsibilities:
1. Quality Inspection ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
7.20 LPA TO 7.80 LPA
Job Description :
10.12.24
HPS/2024/770
PVC Mould Fitter
Male
1
3 to 5
B.Sc/Diplom/ITI
A PVC mold fitter's responsibilities include fitting and assembling molds and tooling to engineering drawings. They may also perform other tasks, such as:
Using hand tools, pillar drills, grinding wheels, and deburing tools
Using engineering measuring equipment
Performing mold maintenance
Handling manpower
Polishing molds
Other roles related to mold fitting include:
Molding technician
Responsible ...
2 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 3.00 LPA
Job description
Carrying out the injection molding machine installation, commissioning and service including monitoring machine parts, trouble-shooting.
Setting up and trouble-shooting hydraulic valves and hydraulic cylinders.
Trouble-shouting minor electronic and electrical issues of machines.
Setting process parameters in machines for required product with minimized and reduced cycle time to utilize the maximum production output ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.20 LPA
27-02-25
85801
HPS/2024/348 HPS/2025/121
Tool Room Engineer - Mould Maintainance
Male
1
2 to 5
ITI/DME
Operating and handling plastic injection molding machine.
Role Workman/Foreman/Technician
Industry Type Chemicals, Petrochemical, Plastic, Rubber
Functional Area Production, Manufacturing, Maintenance
Employment Type Full Time, Permanent
Role Category Production/Manufacturing/Maintenance
Education - 10th /12th / ITI / DME
Salary - 25000 to 35000. And Negotiable
Job designation - Injection molding machine operator.
2 Opening(s)
7.0 Year(s) To 15.0 Year(s)
0.00 LPA TO 12.00 LPA
DUTIES AND RESPONSIBILITIES Technical Capability. Planning Management. Manpower utilization & work review. Time allocation per project. Skill and experience of design database management. Concept to design to product. Independently design Machine concept in Solid work Carry out design calculations for Machine elements like gears, belts, structure, linear motion ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
New Vendor development and Part development
• Cost plus working module implementation with all suppliers
• Costing for new parts & RM
• Cost reduction by VA/VE Activities and Alternate sourcing
• Vendor Consolidation, part communization, Alternate sourcing.
• Supplier evaluation as per QCD Parameter. •
• Capacity planning of Critical parts as HE & Molding ...