1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Quality Control & Assurance (QA/QC)
Perform incoming, in-process, and final quality inspections for raw materials, heavy structural fabrications, machined parts, and bought-out components.
Verify material test certificates (MTR), chemical composition reports, and physical test reports against project specifications.
Monitor welding quality, dimensional tolerances, and alignment checks using precision measuring tools and gauges.
Coordinate Non-Destructive ...
- 1. Core Engineering & Technical Keywords Mechanical Engineering Heavy Fabrication & Structural Steel Industrial Furnaces & Kilns Casthouse Equipment Equipment Design & Drawing Reading Autocad / Solidworks / Catia Plant Maintenance & Troubleshooting Hydraulic & Pneumatic Systems 2. Quality Assurance & Control (qa/qc) Keywords Qa/qc Inspection Dimensional Inspection & Metrology Non-destructive Testing (ndt Level Ii - Ut
- Rt
- Mpi
- Lpi) Material Test Reports (mtr) & Material Verification Vendor Quality Management & Supplier Audits Calibration Management Root Cause Analysis (rca) & Capa (corrective And Preventive Action) 3. Manufacturing Standards & Methodologies Iso 9001:2015 / Quality Management Systems (qms) Six Sigma (green / Yellow Belt) Lean Manufacturing 5s & Kaizen (continuous Improvement) Total Productive Maintenance (tpm) Shop-floor Operations & Safety Protocols
1 Opening(s)
12.0 Year(s) To 18.0 Year(s)
18.00 LPA TO 25.00 LPA
Position: Production Manager
Location: Manesar - Gurgaon
Experience: 12 - 18 Years
Industries: Printing/Packaging
Responsibilities:-
Lead daily, weekly, and monthly production operations to achieve production targets and customer delivery commitments.
Ensure 90%+ OTIF (On-Time In-Full) delivery through effective coordination with PPC, Quality, Maintenance, Stores, Dispatch, NPD, and Sales.
Drive optimum ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Key Responsibilities:
Ensure compliance with cGMP, GLP, FDA and regulatory requirements.
Lead QC team operations, daily task allocation and technical troubleshooting.
Review analytical raw data, HPLC/GC audit trails, SOPs and batch release documents.
Lead investigations related to OOS, OOT, deviations and incidents, including RCA and CAPA.
Manage stability studies, instrument calibration, analytical method validation/transfer and ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 25.00 LPA
Job Title: General Manager – Electrical / Electrical Head Industry: Sponge Iron / DRI / Power Plant / Steel Plant Department: Electrical Maintenance / Power Plant Experience: 15–25 Years in Sponge Iron, DRI & Captive Power Plant Qualification: B.E./B.Tech/Diploma in Electrical Engineering
Key Responsibilities
Lead the complete Electrical Department for Sponge Iron/DRI ...
- Electrical Head
- Gm Electrical
- Sponge Iron
- Dri Plant
- Captive Power Plant
- Power Plant Electrical
- Ht/lt
- Transformer
- Ht Panel
- Lt Panel
- Mcc
- Pcc
- Vfd
- Motors
- Switchgear
- Substation
- Power Distribution
- Whrb
- Afbc/cfbc
- Preventive Maintenance
- Predictive Maintenance
- Breakdown Maintenance
- Electrical Troubleshooting
- Energy Management
- Rca
- Loto
- Electrical Safety
- Project Management
- Team Management
- Sap/erp.
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
12.00 LPA TO 20.00 LPA
Job Title: HOD Laboratory / General Manager – Ferro Alloys Industry: Ferro Alloys / Steel / Metallurgical Plant Department: Quality Control / Laboratory Experience: 15–25 Years in Ferro Alloys / Steel / Metallurgical Laboratory Qualification: M.Sc. Chemistry / B.E./B.Tech Metallurgy / Chemical Engineering
Key Responsibilities
Head and manage the Ferro Alloys Laboratory ...
2 Opening(s)
4.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Our support processes and team are already established. We therefore need someone who can take ownership of the function, proactively review support performance, identify recurring issues and gaps, drive corrective actions, engage proactively with customers, and continuously look at opportunities for automation and improvement.
About the RoleWe are looking for an ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
Not Disclosed by Recruiter
Key Responsibilities
Provide L3 technical support for SAP Fiori and SAPUI5 applications.
Troubleshoot and resolve complex production incidents, defects, and application issues.
Perform detailed Root Cause Analysis (RCA) and implement permanent fixes.
Develop, enhance, and maintain SAP Fiori/UI5 applications.
Work with Fiori Elements, Smart Controls, and SAPUI5 MVC architecture.
Develop, consume, and troubleshoot OData services.
Analyze and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
0.00 LPA TO 30.00 LPA
JOB DESCRIPTION
Plant Engineer / Engineering Manager / Maintenance Manager
Division: Confectionery
Job Overview
To provide engineering leadership through the effective management of maintenance, utilities, reliability, plant assets, and continuous improvement initiatives to ensure safe, efficient, reliable, and cost-effective confectionery manufacturing operations.
The role is responsible for ensuring maximum availability and performance of confectionery processing, production, ...
1 Opening(s)
7.0 Year(s) To 11.0 Year(s)
5.00 LPA TO 9.00 LPA
Position: Quality Manager
Location: Ahmedabad
Experience: 7 - 11 Years
Industries: Infrastructure
Responsibilities:
Establish quality standards and inspection criteria for raw materials (aluminium profiles, gaskets, hardware, glass), in-process stages (cutting, machining, assembly, glazing), and final products.bamboohr+1
Approve control plans, inspection checklists, FMEA, and process capability studies for critical processes.
Ensure first-article approval, ...
15 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Lead and manage the Alumina/Zeolite production stream to achieve safe, reliable and cost-effective manufacturing while meeting production and quality targets. The role will have end-to-end operational responsibility for the entire manufacturing process, with strong focus on process stability, yield improvement, productivity, equipment utilization, cost optimization and continuous improvement. 1. Production ...